Laserfiche WebLink
Civic Center StOrmwater,LtftStaeionRenovation Design Sory's'ces <br />Electrical Engineer <br />Mr. See has over 20 years of professional experience, both <br />domestic and international, in water/wastewater infrastructure, <br />power generation & distribution, emergency backup power <br />systems and construction support. He is specialized in design of <br />electrical systems for water and wastewater facilities including <br />power distribution, control design, and emergency generator <br />installations. He has provided design plans and specification <br />packages for pump stations, wells, sewage lift stations and <br />water/wastewater treatment facilities. Yee Ping is experienced <br />In electrical system inspections during construction to ensure <br />compliance with plans and specifications, responding to <br />contractor Requests for Information, and coordination of <br />electrical utility services to accommodate new and upgraded <br />facilities. He is also experienced with designing control systems <br />including Process and Instrumentation Diagrams. <br />He has provided engineering for new and upgraded power <br />service and distribution, installation of new VFDs for well pumps <br />and RO feed pumps, as well as new SCADA system design and <br />integration. <br />Project Experience <br />Coronado Transbay Lift Station Variable Frequency Drive / <br />Switch Gear Replacement and Genset Installation, <br />Coronado, California. CityofCoronado, Electrical Engineer, <br />Provided design services and construction phase assistance for <br />the Coronado Transbay Lift Station Variable Frequency Drive <br />(VFD)/Switch Gear Replacement and Genset Installation <br />project. Provided complete design for replacement of aging <br />electrical switchgear, relocation of the existing SCADA panel, <br />replacement of aging pump motors with new inverter -duty <br />motors, replacement of unsupported variable frequency drives, <br />replacement of the pump control system with new PLC <br />controller and updated redundant level control system, <br />replacement and update of the dry well ventilation system and <br />gas monitoring system, installation of new 350 kW diesel <br />generator set and automatic transfer switch. <br />Orange County Groundwater Storage Program, Orange <br />County, California. Orange County Water D/strict. Electrical <br />Engineer, Developed project specifications and prepared and <br />performed design activities, including motor control centers, <br />switchboards, panels, transformer, conduit, wiring, and <br />grounding. Prepared design sketches for drafting and <br />incorporation into design criteria. Michael Baker provided <br />engineering plans, specifications, and estimates for the design <br />j <br />i, <br />Years of Experience, 29 <br />Education/Training: <br />B.S„ 1999, Electrical <br />Engineering, western <br />Michigan University <br />Licenses/Certifications: <br />Professional Engineer - <br />Electrical, California, 2003, <br />17163 <br />LEED Accredited Professional, <br />2009 <br />Professional Engineer - <br />Electrical, Nevada, 2009, <br />19899 <br />Professional Engineer - <br />Electrical, Saudi Arabia, 2013, <br />160496 <br />Professional Engineer - <br />Electrical, Arizona, 2018, <br />66471 <br />iH T%R N At I o 0 A4 Yee Ping See, P.E., LEED AP <br />