Civic Center StOrmwater,LtftStaeionRenovation Design Sory's'ces
<br />Electrical Engineer
<br />Mr. See has over 20 years of professional experience, both
<br />domestic and international, in water/wastewater infrastructure,
<br />power generation & distribution, emergency backup power
<br />systems and construction support. He is specialized in design of
<br />electrical systems for water and wastewater facilities including
<br />power distribution, control design, and emergency generator
<br />installations. He has provided design plans and specification
<br />packages for pump stations, wells, sewage lift stations and
<br />water/wastewater treatment facilities. Yee Ping is experienced
<br />In electrical system inspections during construction to ensure
<br />compliance with plans and specifications, responding to
<br />contractor Requests for Information, and coordination of
<br />electrical utility services to accommodate new and upgraded
<br />facilities. He is also experienced with designing control systems
<br />including Process and Instrumentation Diagrams.
<br />He has provided engineering for new and upgraded power
<br />service and distribution, installation of new VFDs for well pumps
<br />and RO feed pumps, as well as new SCADA system design and
<br />integration.
<br />Project Experience
<br />Coronado Transbay Lift Station Variable Frequency Drive /
<br />Switch Gear Replacement and Genset Installation,
<br />Coronado, California. CityofCoronado, Electrical Engineer,
<br />Provided design services and construction phase assistance for
<br />the Coronado Transbay Lift Station Variable Frequency Drive
<br />(VFD)/Switch Gear Replacement and Genset Installation
<br />project. Provided complete design for replacement of aging
<br />electrical switchgear, relocation of the existing SCADA panel,
<br />replacement of aging pump motors with new inverter -duty
<br />motors, replacement of unsupported variable frequency drives,
<br />replacement of the pump control system with new PLC
<br />controller and updated redundant level control system,
<br />replacement and update of the dry well ventilation system and
<br />gas monitoring system, installation of new 350 kW diesel
<br />generator set and automatic transfer switch.
<br />Orange County Groundwater Storage Program, Orange
<br />County, California. Orange County Water D/strict. Electrical
<br />Engineer, Developed project specifications and prepared and
<br />performed design activities, including motor control centers,
<br />switchboards, panels, transformer, conduit, wiring, and
<br />grounding. Prepared design sketches for drafting and
<br />incorporation into design criteria. Michael Baker provided
<br />engineering plans, specifications, and estimates for the design
<br />j
<br />i,
<br />Years of Experience, 29
<br />Education/Training:
<br />B.S„ 1999, Electrical
<br />Engineering, western
<br />Michigan University
<br />Licenses/Certifications:
<br />Professional Engineer -
<br />Electrical, California, 2003,
<br />17163
<br />LEED Accredited Professional,
<br />2009
<br />Professional Engineer -
<br />Electrical, Nevada, 2009,
<br />19899
<br />Professional Engineer -
<br />Electrical, Saudi Arabia, 2013,
<br />160496
<br />Professional Engineer -
<br />Electrical, Arizona, 2018,
<br />66471
<br />iH T%R N At I o 0 A4 Yee Ping See, P.E., LEED AP
<br />
|