PROPOSAL
<br />Civic Center5tormwater[ Lift Station Renovation Design Services
<br />of eight groundwater extraction wells. The wells ranged from 2,000 to 4,500 gallons per minute
<br />and included water-cooled varlable-frequency drives, moveable buildings, disinfection, and
<br />decorative buildings.
<br />Baker Regional Water Treatment Plant, Lake Forest, California, Irvine Ranch Water District.
<br />Electrical Engineer Michael Baker was the lead consultant for the Baker Regional Water
<br />Treatment Plan (BRWTP), For a number of years, water agencies in South Orange County have
<br />investigated alternatives for Improving both water supply and water system reliability. These
<br />agencies determined that a local treatment plant utilizing untreated surface water from
<br />Metropolitan Water District as its source of supply would be the preferred alternative. Michael
<br />Baker provided preliminary and final design services for the BRWTP. The plant is sized for a
<br />capacity of 28 mgd and will utilize microfiltration as the primary method of treatment. Additional
<br />project components include raw water pump station; raw water pump station for Trabuco Canyon
<br />Water District; pretreatment, including chlorine dioxide and coagulant; pressurized MF
<br />membranes; UV disinfection; chloramination; backwash recovery system; solids handling facilities;
<br />DYK reservoir modifications; and product water pump station.
<br />High Level Pump Station and Centralized Power Generation, Pittsburg, California. City of
<br />Pittsburg. Electrical Engineer. Engineering design and controls for a second large pump station at
<br />the City's Water Treatment Plant, including incorporating a 2000Kw natural gas engine generator
<br />in the pump station building. The project combined several electrical meters on the site into a
<br />single large service that included the generation to not only provide emergency backup power for
<br />the entire complex but also gave the City ability to produce their own power during peak summer
<br />months when electric rates are high. The equipment included momentary paralleling switchgear to
<br />offer bumpless transfer between sources.
<br />Ramsgate 1701 11801 Pump Stations, Lake Elsinore, California, Elsinore Valley Municipal
<br />Water District. Electrical Engineer. Michael Baker provided design services for the 1701 and
<br />1801 pump stations, which are part of Phase I water facilities for the new Ramsgate Community
<br />in Lake Elsinore, California. The 925 -gallon -per -minute 1701 pump station and 4,000- gallon -
<br />per -minute 1801 pump station are located on the same site as the 1601 reservoir, Design
<br />services included pumps, valves, piping, and appurtenances, surge tank, motor control center,
<br />emergency generator set, cathodic protection, piping, pump station building, masonry block
<br />wall, site security and an on-site chlorine generation system.
<br />Archibald Pump Station, Chino, California, Electrical Engineer. Developed project
<br />specifications and cost estimation, Prepared and performed design activities, works included
<br />photometric analysis, conduit and wiring sizing, schematic and PLC design, metered pedestals
<br />and utility coordination, sizing circuit breaker and protective devices,
<br />Ontario Pump Station, Ontario, California, Electrical Engineer. Michael Baker provided
<br />engineering for design of the Ontario pump station to facilitate the distribution of water from the
<br />Chino Basin Desalter Authority to the City of Ontario's Eighth Street pressure zone.
<br />NreN NAT i ON n c Yee Ping See, P.E., LEED AP
<br />
|