Laserfiche WebLink
I <br />INTERWEST <br />CONSULTING <br />GROUP <br />www.interwastgrp.com <br />Public Services Director I Senior Civil Engineer <br />1991-1994 City of Whittier <br />After the Whittier Earthquake, Ludwig joined the City of Whittler and undertook <br />responsibility for the Earthquake Damage -Related Improvement Projects, which Included <br />the repair of all damaged Infrastructure within the city limits. In this position, he was <br />responsible for the immediate repair and reconstruction of the city's damaged water <br />system, and the additional task for the City's Landfill Expansion Program. During his three <br />years serving the City, Ludwig completed all earthquake damage -related Improvement <br />projects and expanded the Whittier Landfill by nearly 100 acres. <br />Director of Engineering ( vice President <br />1985-1991 Tait & Associates <br />During his five years with the firm, Ludwig managed both survey and engineering teams <br />and completed projects ranging from residential and commercial development to oil <br />company related work. He also obtained the company's first municipal agency projects. <br />Ludwig also began his experience working on private developments, multiple residential <br />and commercial subdivisions, entitlements, tract and parcel maps, from development <br />review application through full private and conforming public improvements as required <br />and in conformance with the Subdivision Map Act and all development requirements. <br />Included within the work to approval was obtaining environmental approvals with CEQA <br />and NEPA, and the Coastal Commission, if applicable. <br />Designer ( Project Engineer ( Associate Engineer <br />1972-2984 City of Fullerton <br />While attending night school at Cal State Long Beach and working for Fullerton during the <br />day, Ludwig became proficient in roadway and arterial highway design, as well as sewer <br />and storm drain design for numerous projects. As an Associate Engineer, Ludwig provided <br />full project Involvement in obtaining the preliminary engineering through final project <br />acceptance of two grade separation projects — the Lemon Street Underpass and the <br />Gilbert Underpass, both grade separations under the UP and SF Railway lines through the <br />City of Fullerton. Ludwig worked closely with 5 consultant teams, the City's surveyor, <br />design team, inspection team, the right-of-way agents, and the railroads. <br />Military Service <br />1970-2004 U.S. Marine Corps ) U.S. Army Reserve <br />In addition to 2 years as an active duty draftee in the Marine Corps during Vietnam, <br />Ludwig has worked for over 32 years as a military reservist, engineering and artillery <br />officer. While he commanded combat arms troops and units, he planned and executed <br />numerous operational exercises by completing several active duty tours and deploying for <br />up to 13 months to various U.S. and NATO operations around the world, including <br />Republic of Korea (1984,1985,1989,1991, 1994), Panama (1995), Norway (1998), <br />Bosnia/Herzegovina (1995), Germany (1982 and 1984), Kuwait (1991), Ukraine and Russia <br />(2001 & 2004). As a retired Lieutenant Colonel in the U.S. Army Reserve, Ludwig feels very <br />confident In his management of personnel and the resources associated therewith. The <br />experience has been most beneficial and has carried Into his private career as well. <br />PWIZOT46, <br />Page 134 <br />