4 <br />Kamran Saber, PE, QSD/QSP <br />Plan Review Engineer I Project Manager <br />I NT E RTI E <br />CONSULTINGG <br />Kamran has over 30 years of experience in the design and management of major multi- <br />GROUP <br />disciplinary public works projects. His experience includes transportation design, structural <br />design, utility engineering, hydraulic, hydrology, cost estimating, contract specifications, <br />www.intsrwasterp.com <br />constructability analysis, peer reviews, environmental process and reviews, reportwritlng, <br />RFP preparation, construction management and support services. Kamran has a broad <br />E D U C A T 1 O N <br />background in CIP management, planning, design and construction on a wide variety of <br />Mastersofsclence <br />projects including land development, street improvement and rehabilitation, sewer and <br />Civil Engineering <br />storm drain studies and design, grading and drainage. He also has extensive training and <br />California State University, Sacramento <br />hands-on experience In project/resource management and Total Quality Management, <br />CA <br />and is a Certified Facilitator. Additionally, Kamran has extensive expertise In federally and <br />state funded projects through his work managing over 100 federally funded projects <br />Bachelors of science <br />throughout his career. <br />Civil Engineering <br />PolytechnlcTehran <br />Kamran's professional history includes City Engineer experience at the Cities of Covina, <br />R E G 15 T R A T 1 O N 5 <br />Placentia, Villa Park, San Gabriel, and the Town of Yucca Valley. Below Is just a selection of <br />CERTIFICATIONS <br />the many projects Kamran has worked on. <br />CA Registered Civll Engineer) 47567 <br />ROADWAYS & MUNICIPAL PROJECT EXPERIENCE <br />QualiFledSWPPP Developer/PraD/QSer <br />(QSO/QSP) <br />Central Avenue Corridor Improvement, City of Compton, Compton, CA, 2015 — Project <br />Manager and Pavement Engineer for the reconstruction of Central Avenue from 131st <br />P R O F E 5 5 10 N A I <br />Street to Compton Boulevard to address roadway rehabilitation needs In an expedited <br />A F F I I I A T 10 N 5 <br />manner. The project consisted of two segments: Segment 1 from 131st Street to <br />American Society of Civil Engineers <br />Rosecrans Avenue and Segment 2 from Rosecrans Avenue to Compton Boulevard. An <br />(ASCE) <br />Innovative low impact development (LID) approach was selected for the pavement <br />Amerlcan Public Works Association <br />rehabilitation consisting of 2-inch ARHM over 4-Inch in-situ recycled asphalt (Cold Central <br />(APWA) <br />Plant Recycled, CCPR) on top of 8-Inch in-situ cement treated base, also known as Full <br />Society of Amerlon Value Engineers <br />Depth Reclamation (FDR). Ninety percent of the proposed structural section was recycled <br />(SAVE) <br />from the existing road materials with no material hauled out from the project. <br />SocletyofAmerlanMilitary Engineers <br />San Gabriel Boulevard Rehabilitation, Mission Drive to Las Tunas Drive, City of San <br />(SAME) <br />Gabriel, San Gabriel, CA, 2010 — Project Manager and Construction Manager for the 1.5- <br />RallroadAssociation of5outhern <br />mile rehabilitation of San Gabriel Boulevard in the heart of the City of San Gabriel, The <br />California (RASC) <br />project included rehabilitation of pavement using the cost saving method of Full Depth <br />Reclamation (FDR) with the construction cost of approximately $1.9M. Project Included <br />pavement rehabilitation and reconstruction, reconstruction of centerline to Increase cross <br />fall and to Improve cross drainage, curb, gutter and sidewalk repair, addition of gutter <br />plate where missing, addition of cross gutters where missing or nonfunctioning, addition <br />and/or upgrading of curb ramp and reconstruction of damaged driveway aprons. The <br />project design included water quality green feature such as permeable concrete gutters. <br />Maple Avenue Roadway Rehabilitation Project, City of EI Segundo, EI Segundo, CA, 2012 <br />— Project Manager responsible for the preparation of plans, specifications, and estimate <br />(PS&E) and management of the design staff, survey crews and sub consultants, Landscape <br />Architect, and Geotechnical. Mr. Saber performed DA/QC, prepared project specifications <br />and cost estimates, and coordinated the project with various City departments (Water, <br />Planning, Maintenance, landscaping, and sewer). The main objectives of the project were <br />rehabilitation of existing pavement, extensive drainage Improvements, Installation of <br />landscaped median, sidewalks, and Installation of flashing red lights at mid-block <br />crossings, public outreach and ADA ramps. The design and construction were completed <br />within schedule and budget. <br />West Roses Road Rehabilitation, Mission Drive to Del Mar Avenue, City of San Gabriel, <br />San Gabriel, CA, 2010 — Project Manager for the preparation of plans, specifications, and <br />Page 135 <br />25F-89 <br />