4
<br />Kamran Saber, PE, QSD/QSP
<br />Plan Review Engineer I Project Manager
<br />I NT E RTI E
<br />CONSULTINGG
<br />Kamran has over 30 years of experience in the design and management of major multi-
<br />GROUP
<br />disciplinary public works projects. His experience includes transportation design, structural
<br />design, utility engineering, hydraulic, hydrology, cost estimating, contract specifications,
<br />www.intsrwasterp.com
<br />constructability analysis, peer reviews, environmental process and reviews, reportwritlng,
<br />RFP preparation, construction management and support services. Kamran has a broad
<br />E D U C A T 1 O N
<br />background in CIP management, planning, design and construction on a wide variety of
<br />Mastersofsclence
<br />projects including land development, street improvement and rehabilitation, sewer and
<br />Civil Engineering
<br />storm drain studies and design, grading and drainage. He also has extensive training and
<br />California State University, Sacramento
<br />hands-on experience In project/resource management and Total Quality Management,
<br />CA
<br />and is a Certified Facilitator. Additionally, Kamran has extensive expertise In federally and
<br />state funded projects through his work managing over 100 federally funded projects
<br />Bachelors of science
<br />throughout his career.
<br />Civil Engineering
<br />PolytechnlcTehran
<br />Kamran's professional history includes City Engineer experience at the Cities of Covina,
<br />R E G 15 T R A T 1 O N 5
<br />Placentia, Villa Park, San Gabriel, and the Town of Yucca Valley. Below Is just a selection of
<br />CERTIFICATIONS
<br />the many projects Kamran has worked on.
<br />CA Registered Civll Engineer) 47567
<br />ROADWAYS & MUNICIPAL PROJECT EXPERIENCE
<br />QualiFledSWPPP Developer/PraD/QSer
<br />(QSO/QSP)
<br />Central Avenue Corridor Improvement, City of Compton, Compton, CA, 2015 — Project
<br />Manager and Pavement Engineer for the reconstruction of Central Avenue from 131st
<br />P R O F E 5 5 10 N A I
<br />Street to Compton Boulevard to address roadway rehabilitation needs In an expedited
<br />A F F I I I A T 10 N 5
<br />manner. The project consisted of two segments: Segment 1 from 131st Street to
<br />American Society of Civil Engineers
<br />Rosecrans Avenue and Segment 2 from Rosecrans Avenue to Compton Boulevard. An
<br />(ASCE)
<br />Innovative low impact development (LID) approach was selected for the pavement
<br />Amerlcan Public Works Association
<br />rehabilitation consisting of 2-inch ARHM over 4-Inch in-situ recycled asphalt (Cold Central
<br />(APWA)
<br />Plant Recycled, CCPR) on top of 8-Inch in-situ cement treated base, also known as Full
<br />Society of Amerlon Value Engineers
<br />Depth Reclamation (FDR). Ninety percent of the proposed structural section was recycled
<br />(SAVE)
<br />from the existing road materials with no material hauled out from the project.
<br />SocletyofAmerlanMilitary Engineers
<br />San Gabriel Boulevard Rehabilitation, Mission Drive to Las Tunas Drive, City of San
<br />(SAME)
<br />Gabriel, San Gabriel, CA, 2010 — Project Manager and Construction Manager for the 1.5-
<br />RallroadAssociation of5outhern
<br />mile rehabilitation of San Gabriel Boulevard in the heart of the City of San Gabriel, The
<br />California (RASC)
<br />project included rehabilitation of pavement using the cost saving method of Full Depth
<br />Reclamation (FDR) with the construction cost of approximately $1.9M. Project Included
<br />pavement rehabilitation and reconstruction, reconstruction of centerline to Increase cross
<br />fall and to Improve cross drainage, curb, gutter and sidewalk repair, addition of gutter
<br />plate where missing, addition of cross gutters where missing or nonfunctioning, addition
<br />and/or upgrading of curb ramp and reconstruction of damaged driveway aprons. The
<br />project design included water quality green feature such as permeable concrete gutters.
<br />Maple Avenue Roadway Rehabilitation Project, City of EI Segundo, EI Segundo, CA, 2012
<br />— Project Manager responsible for the preparation of plans, specifications, and estimate
<br />(PS&E) and management of the design staff, survey crews and sub consultants, Landscape
<br />Architect, and Geotechnical. Mr. Saber performed DA/QC, prepared project specifications
<br />and cost estimates, and coordinated the project with various City departments (Water,
<br />Planning, Maintenance, landscaping, and sewer). The main objectives of the project were
<br />rehabilitation of existing pavement, extensive drainage Improvements, Installation of
<br />landscaped median, sidewalks, and Installation of flashing red lights at mid-block
<br />crossings, public outreach and ADA ramps. The design and construction were completed
<br />within schedule and budget.
<br />West Roses Road Rehabilitation, Mission Drive to Del Mar Avenue, City of San Gabriel,
<br />San Gabriel, CA, 2010 — Project Manager for the preparation of plans, specifications, and
<br />Page 135
<br />25F-89
<br />
|