My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER ENGINEERING CONSULTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/18/2018
>
25E - AGMT WATER ENGINEERING CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 5:01:52 PM
Creation date
9/13/2018 4:56:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
9/18/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES AND SCHEDULE <br />Dudek Landscape Architects will assist in the preparation of interpretive signage presentation displays <br />and mounting strategies, based on sign layouts and graphics developed by the City. Developed <br />designs will be included in the construction document package in both plan and detail format with <br />supportive notes and specifications to provide accurate direction for installation. <br />Sign content development: <br />Dudek will identify significant features of the Centennial lake habitat and create an informational <br />narrative that describes the habitat, it's fauna and flora inhabitants, and their impacts on the lake and <br />surrounding environs. This narrative will be the basis for the content of the interpretive signage and <br />information kiosk at the lake shoreline. A draft of the narrative will be presented for client review and <br />revisions prior to proceeding with design of the signage. <br />Interpretive signage design: <br />Dudek proposes to design one informational kiosk sign which will be Installed at the east end of the <br />lake shoreline. This kiosk will include a structural design that integrates Into the natural landscape <br />surroundings, and will incorporate multiple sign panels displaying information about the lake, park <br />history and development, maps, local habitats, and other visitor information related to the site, such <br />as lake hours, site regulations, etc. <br />In addition to the kiosk, two different interpretive sign panel displays will be designed to present <br />information to visitors about Centennial lake and its habitat: <br />1) One display will identify the waterfowl species that Inhabit the lake area and provide <br />information and instructions related to feeding stations located onsite. This information will <br />be replicated on several signs around the lake. <br />2) A second interpretive panel design will identify various lake habitats, fauna and flora, and <br />provide more specific information about the Centennial Lake environment. <br />Dudek will provide the interpretive signage content and design, Including sign panel layout, <br />typography selection, Illustration and graphic design, material specification recommendations, and <br />working drawings for fabrication estimates. <br />The biological work will Include a site visit by a Wildlife Biologist to further evaluate site conditions <br />and provide assistance with the development of design modifications to the Island to support <br />wildlife use. The Wildlife Biologist will also assist with the selection of native plant materials <br />appropriate for the intended function of the modified island and the lake margin planting areas, to <br />support waterfowl and wildlife use. <br />Deliverables: <br />• 60% Design Lake Renovation Plan Set (30-35 sheets) <br />• Draft Lake Manual <br />• 60% Construction Specifications <br />• Preliminary Engineer's Estimate <br />Task 3: Construction Documents (90% and 100% plans) <br />In the Final Design Construction Document phase Dudek will incorporate comments and input from <br />the City Into the project design and finalize the Lake Renovation Plan Set and project design to the <br />90% and then the 100% completion level. We anticipate two (2) submittals to the city for review; one <br />for the 90% complete set of construction documents and one for the 100% complete set of <br />construction documents. In this phase, we will revise and finalize the design and facility sizing <br />calculations for the mechanical equipment including the circulation pumps, sump pumps, water <br />DUDEK Proposal for Centennial Lake Renovation 22 <br />25E-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.