Laserfiche WebLink
PROJECT MANAGER • IRVINE, CA <br />Mr. Richardson has more then 30 years of comprehensive <br />planning, civil engineering and project management experience <br />...'Education' <br />on transportation, streets, Infrastructure and municipal capital <br />BS, Civil Engineering;'' < .:.:::: <br />Improvement projects. His direct experience includes the preparation'Unive�sity,of:Tens; <br />Austinr TX;::; <br />and review of public bid documents, and his project management <br />c::1986`` '• . -:, ; ._: <br />experience Includes leading multidisciplinary consultant teams <br />6S :Urban Riannin ;Univers <br />g <br />and contractors, scheduling, permit processing, and performing <br />- <br />of.. Virginia;_V...19,83. <br />constructability reviews, with the proven ability to execute multiple <br />complex projects on budget and on schedule. He is well versed <br />RegisVatwns .i <br />In transportation -related, public agency, and regulatory agency <br />:Registered Frofess';ona.( .i;";: '-: <br />specifications and requirements.Engineer, <br />California No_ <br />46808,1991 ' .' <br />Relevant Experience <br />Exposition Line Bikeway, Cheviot Hills, City of Los Angeles <br />Professional <br />BOE, Los Angeles, CA. Mr. Richardson was Project Manager <br />:Professional Af Iliations .' "...- <br />for the Plans Specifications and Estimates for this 3/4 mile bikeway <br />. Arriencan Public Works <br />connection. Wayne lead s multi discipline team of experts through <br />"design <br />_ <br />Ms-oclatton Chair, Streeis & i <br />the excellence" program at the City In the development of a <br />TecHnology, Committee :, <br />Class 1 and Class 2 bikepath, Wayne's value engineering resulted In <br />a'American Planning <br />reduced retaining structures, and Innovative drainage solutions for <br />:Association,; Transpgi <br />cost saving s. <br />' :'C nfinn -A rlvicnni ("ni irieil :.••.::',':=,1 <br />Active Transportation Project (ATP) 2 and 3, City of Los Years :oT: txpenence <br />Angeles, Bureau of Engineering, Los Angeles, CA. Project 30 <br />Engineer. Responsible for quantity take -off and cost estimate for the <br />Boyle Heights Linkage Project active transportation projects (ATP <br />2). The goal of ATP 2 is to Improve pedestrian safety and access to <br />the City of Los Angeles' Sixth Street Viaduct and Sixth Street PARC <br />Projects, specifically aiming to Improve the pedestrian circumstances <br />for users of the Aliso Pico Recreation Center, Pecan Recreation y <br />Center, and Boyle Heights Technology Youth Center. A second ATP <br />project, ATP 3, benefits the Downtown Los Angeles Arts District. i <br />The ATP 3 Project will provide pedestrian and cyclist Improvements ' <br />including new cycle tracks, bike lanes, bike routes, new and widened <br />sidewalks with curb extensions, new traffic controlled intersections, <br />a new shared street connecting to the new Sixth Street Viaduct <br />Arts Plaza, as well as green street elements. The goal of these two <br />Caltrans Local Assistance Program funded projects is to increase <br />the mobility and safety for non -motorized users to achieve the <br />regional agency's greenhouse gas reduction goals, and aid In the <br />enhancement of the public's health. Tetra Tech is currently preparing <br />the Pre -Design Reports for both the ATP 2 and ATP 3 project. <br />City of Costa Mesa, Victoria Street Rehabilitation, Costa <br />Mesa, CA. Principal for the rehabilitation of approximately 2.5 miles <br />of arterial roadway, the primary east -west connector from the Santa <br />Ana River to Harbor Boulevard. Project oversight included mill and <br />overlay, utility relocations, traffic signal modifications, restriping, and <br />final PS&E. Performed rigorous cost -benefit analysis for conventional <br />and alternative pavement sections and construction methods. <br />25F-54 <br />