My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2018
>
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 9:29:20 AM
Creation date
9/20/2018 5:10:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2018-075
Date
9/18/2018
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Impact Statement Impact Summary Findings <br />CAP, some after implementation <br />of mitigation measures <br />Hazards' and Hazardous Materials <br />Impact 4.4-2: Construction <br />activities associated with <br />implementation of the proposed <br />project could result in the release <br />of hazardous materials to the <br />environment through reasonably <br />foreseeable upset and accident <br />conditions. <br />Impact 4.4-4: The proposed <br />project area includes sites that <br />are included on a list of <br />hazardous materials sites and, as <br />a result, could create a significant <br />hazard to the public or <br />/environment. <br />Impact 4.4-5: Implementation of <br />the proposed project could <br />interfere with an adopted <br />emergency response plan or <br />emergency evacuation plan. <br />Construction of future <br />development projects proposed <br />in the MEMU Overlay Zone <br />expansion area could pose a <br />hazardous materials exposure <br />risk to future development <br />projects proposed in this area <br />during construction. However, <br />implementation of mitigation <br />would reduce potential impacts <br />to less than significant <br />A Leaking Underground Storage <br />Tank site was identified within <br />the MEMU Overlay Zone <br />expansion area, which could pose <br />an exposure risk to construction <br />personnel. However, <br />implementation of mitigation <br />would reduce potential impacts <br />to less than significant. <br />Development projects in the <br />MEMU Overlay Zone expansion <br />area would not impair <br />implementation of or physically <br />interfere with an adopted <br />emergency response plan or <br />emergency evacuation plan. <br />Large construction vehicles <br />entering and exiting construction <br />sites would be guided by the use <br />of personnel using signs and flags <br />to direct traffic. Adequate <br />2. CEQA Findings <br />Finding 1. Changes or alterations have been required in, or incorporated <br />into the project which avoid, substantially lessen, or reduce the magnitude <br />of the significant environmental effect. <br />Implementation of mitigation measures MM -OZ 4.6-2 and MM -OZ 4.6-3 <br />from the MEMU EIR would require preparation of a preliminary <br />environmental site assessment and address potential exposure impacts <br />associated with previously unidentified contamination for future <br />development projects in the MEMU Overlay Zone expansion area thereby <br />reducing the potential impact from accidental release and exposure to <br />hazardous materials to less that significant. <br />Finding 1. Changes or alterations have been required in, or incorporated <br />into the project which avoid, substantially lessen, or reduce the magnitude <br />of the significant environmental effect. <br />Implementation of mitigation measure MM -OZ 4.6-2 from the MEMU EIR <br />would require preparation of a preliminary environmental site assessment <br />and subsequent investigation and reduce potential impacts to less than <br />significant. <br />Finding 1. Changes or alterations have been required in, or incorporated <br />into the project which avoid, substantially lessen, or reduce the magnitude <br />of the significant environmental effect. <br />Adequate emergency access to the project area and surroundings would be <br />provided through implementation of mitigation measures MM -OZ 4.6-5 and <br />MM -OZ 4.6-6 during construction. Moreover, the City's Emergency <br />Preparedness Plan would be updated as required by MEMU EIR mitigation <br />measure MM -OZ 4.6-7 and would be implemented to address the potential <br />for accidental release of hazardous materials during project operations. <br />Therefore, impacts resulting from the proposed project would be less than <br />significant. <br />Metro East Mixed -Use Overlay, District Expansion and Elan August 2018 <br />Development Projects 2-6 ICF 19.18 <br />Findings of Fact/Statement of Overriding Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.