My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2018
>
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 9:29:20 AM
Creation date
9/20/2018 5:10:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2018-075
Date
9/18/2018
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Impact Statement Impact Summary Findings <br />emergency access to the project <br />area and surroundings would be <br />provided through <br />implementation of mitigation <br />therefore, impacts resulting from <br />the proposed project would be <br />less than significant. <br />2. CEQA Findings <br />Hydrology and Water Quality, <br />Future development could result <br />. <br />Impact 4.5-1: Implementation of <br />It is possible that future <br />Finding 1. Changes or alterations have been required in, or incorporated <br />the proposed project would not <br />development projects would <br />into the project which avoid, substantially lessen, or reduce the magnitude <br />violate water quality standards, <br />increase the amount of <br />of the significant environmental effect. <br />waste discharge requirements, or <br />impervious surfaces that could <br />Implementation of mitigation measure MM -OZ 4.7-1 from the MEMU EIR <br />otherwise substantially degrade <br />potentially increase the amount <br />Implementation of mitigation measure MM -OZ 4.7-1 from the MEMU EIR <br />water quality. <br />of stormwater runoff. However, <br />would require that future development projects in the Overlay Zone <br />because a majority of the MEMU <br />prepare Storm Drain Plans, Stormwater Pollution Prevention Plans <br />Overlay Zone expansion area is <br />(SWPPP), and Water Quality Management Plans (WQMP) conforming to the <br />already built out, any increase in <br />current National Pollutant Discharge Elimination System (NPDES) <br />impervious surfaces is <br />requirements, and would thus reduce impacts to less than significant <br />Metro East Mixed -Use Overlay District Expansion and Elan <br />anticipated to be minor in <br />Development Projects <br />relation to existing conditions. <br />With implementation of <br />mitigation, impacts on water <br />quality from the proposed project <br />would be less than significant. <br />Impact 4.5-2: Future <br />Future development could result <br />Finding 1. Changes or alterations have been required in, or incorporated <br />development in the MEMU <br />in minor alterations to drainage, <br />into the project which avoid, substantially lessen, or reduce the magnitude <br />Overlay Zone expansion area <br />such as changes in ground surface <br />of the significant environmental effect. <br />could alter the existing drainage <br />permeability via paving, or <br />pattern of the area and <br />changes in topography via <br />Implementation of mitigation measure MM -OZ 4.7-1 from the MEMU EIR <br />potentially result in erosion and <br />grading and excavation. With <br />would require future developers to prepare a storm drain plan and WQMP. <br />siltation. <br />implementation of mitigation, <br />Implementation of these plans would reduce the volume of sediment -laden <br />impacts from alteration of <br />runoff discharging from sites within the MEMU Overlay Zone expansion <br />existing drainage patterns during <br />area. Therefore, with implementation of mitigation measure MM -OZ 4.7-1 <br />construction and operation <br />from the MEMU EIR, impacts from alteration of existing drainage patterns <br />would be less than significant. <br />during construction and operation would be less than significant. <br />Metro East Mixed -Use Overlay District Expansion and Elan <br />August 2018 <br />Development Projects <br />2-7 ICF 19.18 <br />Findings of Fact/Statement of Overriding Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.