My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2018
>
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 9:29:20 AM
Creation date
9/20/2018 5:10:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2018-075
Date
9/18/2018
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Impact Statement Impact Summary Findings <br />2. CEQA Findings <br />Impact 4.5-3: Future Future development projects Finding 1. Changes or alterations have been required in, or incorporated <br />development in the MEMU could increase stormwater runoff into the project which avoid, substantially lessen, or -reduce the magnitude <br />Overlay Zone expansion area through development of vacant of the significant environmental effect. <br />could alter the existing drainage land and the creation of more <br />pattern and potentially result in impervious surfaces in the Adherence to mitigation measure MM -OZ 4.7-1 would require the <br />increased downstream flooding planning area. Implementation of preparation of a WQMP and implementation of BMPs, which could <br />through the addition of mitigation would reduce the incorporate stormwater detention facilities and would reduce the volume of <br />impervious surface, or exceeding volume of runoff generated in the runoff generated (and potential for flooding) in the expansion area. <br />the capacity of existing or expansion area; therefore, Implementation of mitigation measure MM -OZ 4.7-2 would ensure that <br />planned stormwater drainage impacts would be less than build out of the MEMU Overlay Zone does not result in exceedance of the <br />systems. significant. capacity of existing or planned stormwater drainage systems. Thus, with <br />implementation of mitigation measures MM -OZ 4.7-1 and MM -OZ 4.7-2 <br />alteration of existing drainage patterns, including the addition of <br />impervious surface, would not result in downstream flooding or exceed the <br />capacity of existing or planned stormwater drainage systems. These <br />findings are consistent with the findings of the MEMU EIR. No new impacts <br />would occur and no new mitigation would be required. Impacts would be <br />less than significant. <br />Noise <br />Impact 4.7-1: Construction <br />Noise generated during onsite <br />Finding 1. Changes or alterations have been required in, or incorporated <br />activities associated with the <br />construction of future <br />into the project which avoid, substantially lessen, or reduce the magnitude <br />proposed project would generate <br />development projects would <br />of the significant environmental effect. <br />temporary noise levels in excess <br />involve a different mix of <br />of the noise limits typically <br />equipment operating, and noise <br />Implementation of mitigation measures MM -OZ 4.9-1 through 4.9-4 would <br />imposed by the City of Santa Ana <br />levels would vary based on the <br />ensure that impacts associated with construction -related noise would be <br />Municipal Code. <br />amount of equipment in <br />minimized and that that construction activity occurs only during the hours <br />operation and the location of the <br />exempted by the City of Santa Ana Municipal Code. Therefore, this impact <br />activity. However, the duration of <br />would be less than significant. <br />activity close to any individual <br />receptor would be limited, and <br />noise levels would reduce rapidly <br />as work moves away from the <br />receptor location. With <br />implementation of mitigation <br />Metro East Mixed -Use Overlay District Expansion and Elan August 2018 <br />Development Projects 2-8 ICF 19.18 <br />Findings of Fact/Statement of Overriding Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.