Laserfiche WebLink
REFERENCES <br />Gary Lam, Project Manager <br />213/694-4329 <br />gary.lam@lacity.org <br />City of Los Angeles <br />Bureau of Engineering <br />585 S, Santa Fe Avenue <br />Los Angeles, CA 90013 <br />Relevant Projects Completed: <br />I Active Transportation Projects (ATP) <br />2and 3 <br />M Sixth Street Viaduct PARC project <br />Lincoln Avenue Pedestrian Pathway Connectivity I Pack Lane to Santiago Creek <br />Mr. John Koo <br />213/485-4750 <br />john.koo@lacity.org <br />City of Los Angeles <br />Bridge Improvement Program <br />1149 S. Broadway <br />Los Angeles, CA 90015 <br />Relevant Projects Completed: <br />L''t Los Angeles River Greenway - West <br />Valley <br />Elizabeth Kavanaugh <br />805/781-4089 <br />ekavanaugh@co.slo.ca.us <br />County of San Luis Obispo <br />General Services Agency <br />1087 Santa Rosa Street <br />San Luis Obispo, CA 93408 <br />Relevant Projects Completed: <br />:! Templeton to Atascadero Connector <br />Trail <br />SCOPE OF SERVICES AND SCHEDULE (REVISED 8/15/18) <br />BACKGROUND <br />The City of Santa (the City) submitted an <br />application for the Active Transportation Program <br />(ATP) funds for the Lincoln Avenue Pedestrian <br />Pathway Connectivity project on May 2015, They <br />received ATP state grant funds for the design and <br />construction of a pathway on the west side of the <br />railroad tracks, The proposed pathway will run <br />parallel and west of Lincoln Avenue west of the <br />railroad tracks. <br />The qualified Tetra Tech Team will provide the <br />services as listed in the RFP 018-042 and as <br />further described below to the City's satisfaction, <br />engaging the community in the process and <br />employing best industry praotioes and best <br />management practices. <br />In general, Tetra Tech will prepare construction <br />plans & specifications (construction contract <br />documents) and engineer's cost estimates for <br />the Lincoln Avenue Pedestrian Pathway between <br />Park Lane and Santiago Creek as well as a <br />connection under the railroad bridge to the existing <br />decomposed granite trail just north of Fairhaven <br />Avenue (approximately 900 feet). <br />V Project Management and <br />Conceptual Design <br />PROJECT MANAGEMENT AND <br />COORDINATION <br />Tetra Tech will be fully responsible for the overall <br />management and coordination for the project, <br />TETRATECH 21 <br />