Laserfiche WebLink
City of Santa Ana <br />consider if solar powered lighting options may <br />be advisable and recommend an option for the <br />City's consideration for this lighting alternative. <br />As required, coordination with SCE will also be <br />provided by Tetra Tech, <br />LANDSCAPING AND IRRIGATION <br />DESIGN <br />Tetra Tech will prepare the landscaping and <br />irrigation design PS&Es prioritized with drought <br />tolerant and native species of planting options. <br />Plant, tree, and wall vine selection will be based <br />with a sense of plant durability and aesthetic <br />appropriateness for the project pathway and to <br />withstand regular use in the area from the public. <br />TRAFFIC SIGN, STRIPING & DETOUR <br />DESIGN <br />Tetra Tech will prepare PS&E's to incorporate the <br />traffic signage, striping and pedestrian/bicycle <br />detour signage as appropriate for this active <br />transportation pathway use. This work will be in <br />compliance with the CA MUTCD and ensure safety <br />and appropriate durability of signs and markings <br />with the expectation of regular use by the public, <br />PERMITS <br />The recommended design to retain runoff on -site <br />discussed in the Approach Section will alleviate <br />the need for an extensive permitting and potential <br />environmental impacts. If the recommended <br />design approach is granted approval from the City, <br />Tetra Tech will coordinate with Region 8 of the <br />Regional Water Quality Control Board (RWQCB), <br />US Army Corps of Engineers, the Orange County <br />Flood Control District (OCFCD), and the California <br />Department of Fish and Wildlife (CDFW) to ensure <br />that all agencies don't require any specific permits. <br />Optional: If the project requires a storm drain <br />improvement to extend into Santiago Creek, Tetra <br />Tech will coordinate and apply for all applicable <br />permits including US Army Corps of Engineers <br />Section 404 and 408 (If applicable) Clean Water Act <br />(CWA) permit application, California Department <br />of Fish and Wildlife (CDFW)1602 application (if <br />26 DESIGN SERVICES RFP NO.: 18-042 <br />applicable), NPDES M84 permit, OCFCD Discharge <br />Permit (If applicable), and Regional Water Quality <br />Control Board Region 8 CWA Section 401 Water <br />Quality Standards Certification. <br />Regardless of the drainage approach, Permit <br />compliance will Include Encroachment Permits <br />with Metrolink (SCRRA), CPUC, and the County. <br />Right -of -Entry permits may also likely be required <br />and Tetra Tech will advise it any other permits are <br />necessary. <br />R QUALITY MANA <br />(REMOVED FROM <br />If the ]acted design triggers the nee form <br />WQMP, atra Tech will coordinate w the Clty for <br />the Low I act Development (t ID requirements on <br />the project a d to prepare a pro' ct specific Water <br />Quality Manag ant Plan (W MP) Inclusive of <br />percolation and titration t t results. Although a <br />previously propose path ay concept exists, our <br />team will provide re andations for appropriate <br />pathway surface tree nts, BMP types, and <br />drainage improvem nts a In accordance with the <br />City of Santa An standard Santa Ana Regional <br />Water Quality ntrol Board der No. R-8-2009- <br />0030 and Or ge County WQ requirements. <br />At a minim , three alternative su ace treatments <br />will be a Iuated and proposed to th City. The <br />propos I will Include their pros/cons, d ability, <br />Infiltr tIon capability, walkability, rideā€¢abi <br />(fo bicyclists), ADA compliance, maintenarlge <br />r quirements, and cost differentials, <br />STRUCTURAL CALCULATIONS <br />Structural calculations and diagrams for all <br />structural related components will be provided <br />for during the final design. Structural and wall <br />calculations will be checked/confirmed, signed, <br />and stamped by our lead structural Engineer who <br />is a Registered Civil Engineer duly licensed by the <br />State of California and not involved with the original <br />design. The Independent checker will reanalyze the <br />structure and complete the following: <br />Review relevant background, wall calculations <br />and supporting information; <br />