My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 12:48:26 PM
Creation date
10/8/2018 4:33:28 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH
Contract #
A-2018-224
Agency
Public Works
Council Approval Date
9/18/2018
Expiration Date
10/1/2020
Insurance Exp Date
10/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Glty of Santa Ana <br />TS-28 Traffic Signal Notes <br />Electronic copies of Special Provisions (SSPs) <br />(in MS Word showing tracked changes) with <br />electronic submittals; as SSPs, with 90% level <br />quantities and estimates, pay Item list, design <br />calculations, and draft Reports <br />Electronic copies of cost estimate and check <br />quantity calculations Electronic copies of design <br />calculations <br />"`] Electronic copies of design check calculations <br />Electronic copies of WQMP-errr! Soils Report to <br />a 90% level <br />Tetra Tech will provide the Final PS&E documents <br />for review and approval of the City in both hardeopy <br />and electronic copy per the RFP requirements <br />and they will be ready to advertise the project for <br />construction, <br />28 DESIGN SERVICES RFP NO.: 18-042 <br />V Bid & Construct! <br />Support <br />Tetra Tech will be available to respond to any <br />questions or items requiring Interpretation in the <br />drawings or specifications are discovered during <br />the bidding period. Our design team will respond <br />to any RFIs (Requests for Information) throughout <br />the Construction and advertisement phases of the <br />project within three working days. Any RFIs will first <br />be analyzed by Tetra Tech and a recommendation <br />will then be provided to the City, and/or through an <br />amendment or change order. Tetra Teach will also be <br />available to review any proposed addenda. Sid and <br />Construction Support Services will also include: <br />r:? Attending the pre -construction meeting with <br />the successful construction contractor upon <br />notification by the City. <br />,,s Review of submittals and shop plan drawings <br />required to support the construction contract. <br />Tetra Tech will complete shop drawings reviews <br />within two (2) weeks of receipt, Contract Change <br />Order reviews will be completed within two (2) <br />working days of receipt. <br />U Tetra Tech will be available as requested by the <br />City to resolve.discrepancies In the contract <br />documents and understarids we have no authority <br />to issue instruction on behalf of the City, or to <br />deputize another to do so. <br />Tetra Tech will prepare end deliver to the City <br />the final as -built plans incorporating field marked <br />prints supplied by the City. All changes to the <br />plans will be incorporated electronically with all <br />necessary revision notations and submitted to the <br />City. An electronic file will be submitted to the City <br />In Microstation V81 CADD and pdf formats for the <br />final as -built plans via CD, email or through an <br />FTP site as required by the City. <br />V Assumptions and <br />Exclusions <br />Base map will show record boundary and a <br />full boundary establishment survey will not be <br />performed. <br />to Topographic Survey will be performed by aerial or <br />scan without encroaching Into the rail road ROW. <br />
The URL can be used to link to this page
Your browser does not support the video tag.