Laserfiche WebLink
Association, Transportation , <br />An ctioAdvispry Council <br />Years of Experience <br />30., <br />PROJECT MANAGER • IRVINE, CA <br />Mr. Richardson has more then 30 years of comprehensive <br />planning, civil engineering and project management experience <br />on transportation, streets, Infrastructure and municipal capital <br />Improvement projects. His direct experience includes the preparation <br />and review of public bid documents, and his project management <br />experience includes leading multidisciplinary consultant teems <br />and contractors, scheduling, permit processing, and performing <br />constructability reviews, with the proven ability to execute multiple <br />complex projects on budget and on schedule, He is well versed <br />In transportation -related, public agency, and regulatory agency <br />specifications and requirements, <br />Relevant Experience <br />Exposition Line Bikeway, Cheviot Hills, City of Los Angeles <br />BQE, Los Angeles, CA. Mr. Richardson was Project Manager <br />for the Plans Specifications and Estimates for this 3!a mile bikeway <br />connection. Wayne lead a multi-disclpiine team of experts through <br />the "design excellence" program at the City in the development of a <br />Class 1 and Class 2 bikepath, Wayne's value engineering resulted in <br />reduced retaining structures, and Innovative drainage solutions for <br />cost savings. <br />Active Transportation Project (ATP) 2 and 3, City of Los <br />Angeles, Bureau of Engineering, Los Angeles, CA. Project <br />Engineer. Responsible for quantity take -off and cost estimate for the <br />Boyle Heights Linkage Project active transportation projects (ATP <br />2). The goal of ATP 2 is to Improve pedestrian safety and access to <br />the City of Los Angeles' Sixth Street Viaduct and Sixth Street PARC <br />Projects, specifically aiming to improve the pedestrian circumstances <br />for users of the Aliso Pico Recreation Center, Pecan Recreation <br />Center, and Boyle Heights Technology Youth Center. A second ATP <br />project, ATP 3, benefits the Downtown Los Angeles Arts District. <br />The ATP 3 Project will provide pedestrian and cyclist improvements <br />including new cycle tracks, bike lanes, bike routes, new and widened <br />sidewalks with curb extensions, new traffic controlled intersections, <br />a new shared street connecting to the new Sixth Street Viaduct <br />Arts Plaza, as well as green street elements. The goal of these two <br />Caltrans Local Assistance Program funded projects is to Increase <br />the mobility and safety for non -motorized users to achieve the <br />regional agency's greenhouse gas reduction goals, and aid In the <br />enhancement of the public's health. Tetra Tech is currently preparing <br />the Pre -Design Reports for both the ATP 2 and ATP 3 project.. <br />City of Costa Mesa, Victoria Street Rehabilitation, Costa <br />Mesa, CA. Principal for the rehabilitation of approximately 2.5 miles <br />of arterial roadway, the primary east -west connector from the Santa <br />Ana River to Harbor Boulevard. Project oversight Included mill and <br />overlay, utility relocations, traffic signal modifications, restriping, and <br />final PS&E. Performed rigorous cost -benefit analysis for conventional <br />