My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - LIGHTING ROSS ANNEX PARKING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
25D - AGMT - LIGHTING ROSS ANNEX PARKING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:18:03 PM
Creation date
11/15/2018 9:12:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25D
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approve Agreement to Install LED Lights and Controls <br />Ross Annex Parking Garage, On -Bill Financing <br />November 20, 2018 <br />Page 2 <br />SCE. City staff, with the assistance of The Energy Network, has selected a contractor for both the <br />Police Department Administration Building and Corporate Yard Facilities lighting projects; and <br />installation of improvements are well underway, with a scheduled completion date at the end of <br />November 2018. <br />At this time, staff is requesting Council approval to implement the Ross Annex Parking Garage <br />lighting retrofit project. The Scope of Work consists of new light fixtures (replace fluorescent units <br />with energy-efficient light -emitting diode [LED] lights) and light controls (install occupancy sensors <br />and connect to lighting and Building Management systems). Project benefits include improved <br />illumination similar to the adjacent Civic Center Parking Garage; an annual reduction of 10,546 <br />kWh in electric usage; annual electric bill savings of $1,354, and annual greenhouse gas <br />reductions equivalent to eliminating almost 2 vehicles from driving a combined 19,237 miles (EPA <br />Greenhouse Gas Equivalencies Calculator). <br />Project funding of $15,515 has been approved by SCE, and includes cash incentives of $1,979, <br />and zero interest On -Bill Financing (OBF) of up to $13,536. An innovative feature of this SCE <br />program is that the City will have no upfront costs and will incur no new debt. All payments are <br />made from the savings realized on the utility bill. Any lighting upgrades not included in the project <br />specifications but authorized by the City will be paid separately by the City. <br />Through the OBF program, the awarded contractor finances the cost of the project. SCE pays <br />the contractor directly with the cash incentives (which are grants and do not need to be repaid by <br />the City) and the OBF proceeds that SCE has approved for the project. Once the retrofits are <br />completed and inspected, the Ross Annex Parking Garage will realize lower utility charges on <br />their electric bill. However, the bill will have a new, separate line delineating the monthly OBF <br />payment. Once the OBF payments are made in full (10 years), SCE will discontinue the OBF <br />repayment charge. <br />Staff requests the City Council approve the funding process for this project, and authorize the City <br />Manager and Clerk of the Council to execute an OBF agreement with SCE. The SCE Notice of <br />Approval for incentives and OBF proceeds (Exhibits 1 and 2) and an example OBF agreement <br />form (Exhibit 3) are attached. <br />On August 6, 2018, staff posted the Request for Proposal (RFP) for the Ross Annex Parking <br />Garage Energy Lighting Retrofit (Exhibit 4) on the City's website and online bid management and <br />publication system. Three proposals were received and opened on September 20, 2018. The <br />proposals were evaluated and ranked by a review committee comprised of staff from the Public <br />Works Agency and Building Maintenance. The ranking criteria included the experience of the firm <br />and team, relevant project experience, understanding of the scope of work, the work plan, <br />references, schedule, and fee. The ranking of the three firms is as follows: <br />25D-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.