Laserfiche WebLink
GPA No. 2018-05, AA No. 2018-08, <br />CUP No. 2018-18 & VAR No. 2018-10 <br />September 24, 2018 <br />Page 3 <br />Item: <br />Information' : ' - <br />South <br />I Commercial - City of Tustin <br />West <br />I Professional - Service Station <br />Property Size <br />39,775 SF (0.9 acres) - 301 N. Tustin Avenue <br />22,465 SF 0.5 acres - 325 N. Tustin Avenue <br />Existing Site Development <br />Eating Establishment - 301 N. Tustin Avenue <br />Gas Service Station & Car Wash - 325 N. Tustin Avenue <br />Development Standards <br />Sections 41-364 through 41-374 SAMC <br />Sections 41-377 through 41-388 SAMC <br />Use Permissions/Amendment <br />Application &CUP <br />Section 41-638 and Sections 41-659 through 41-667 <br />9 <br />Project Description <br />The applicant proposes to demolish the restaurant, service station, car wash, and convenience <br />store buildings to construct a new service station, convenience store and multi -tenant commercial <br />building on two properties at the southeast comer of Tustin Avenue and Fourth Street. <br />The restaurant at 301 North Tustin will be demolished and a new 7,368 -square -foot multi -tenant <br />commercial building with an outdoor dining area will be constructed. A 1,258 -square -foot eating <br />establishment with drive-through service is proposed for one unit. The drive-through lane is <br />designed to wrap around the entire building, with the entrance of the drive-through at the south end <br />of the building traveling up and around the east elevation. In addition, a 35 -foot high freestanding <br />sign will be oriented towards the SR -55 freeway along the east property line. The parcel <br />immediately to the north at 325 North Tustin Avenue is also proposed for redevelopment. The <br />applicant is proposing to clear the site, to eliminate the automated car wash operations, close a <br />driveway along Fourth Street and redesign the site with a service station and larger convenience <br />store. The service station will consist of a 2,117 -square -foot canopy with 8 pump stations and a new <br />2,778 -square -foot convenience store. <br />The architecture of the new buildings, service station canopy and freestanding sign has been <br />designed to appear as a cohesive and integrated on <br />which includes a contemporary <br />design style with a smooth plaster, metal canopies, ceramic wood tile and green screens. An <br />enhanced pedestrian pathway with seating areas and landscaping will be located between the two <br />buildings. There will be vehicular access between the two properties and a covenant to allow for <br />reciprocal access and parking will be recorded. In addition, the Public Works Agency has <br />determined that an 8 -foot irrevocable offer of dedication along Fourth Street and a 2 -foot <br />irrevocable offer of dedication along Tustin Avenue are required. Tables 3A and 3B provide a <br />detailed comparison of the project's compliance with the applicable land use and development <br />standards. <br />75B-6 <br />