Laserfiche WebLink
Agreement for EV Charging Stations <br />December 18, 2018 <br />Page 2 <br />Huntington Beach, Orange, Westminster, Lake Forest and Laguna Beach. Voltaic, located in <br />Garden Grove, is one of their authorized charging station providers. <br />Recently, the City of Santa Ana received grant and subvention funds from the Southern California <br />Air Quality Metropolitan District (AQMD) for the purchase and installation of six additional electric <br />vehicle charging stations which will be located in three downtown parking structures and at the <br />Corporate Yard. These charging stations will be available for both public use and for City <br />vehicles, depending on the location of the charging station. The specific locations for the <br />charging stations are as follows: <br />ChargePoint, Inc. provides a networked approach to EV purchases, where charging locations <br />and payments are made available on a real-time basis on the user's smartphone or vehicle <br />navigation system. Additionally, all EV charging station usage data is available to the City in a <br />cloud environment and include a wide variety of reports to help provide an ongoing review of <br />each station, including revenues received and actual electrical costs. The proposed purchase <br />includes a five-year maintenance contract with Voltaic that includes all costs for networking, <br />upgrades and as -needed maintenance. <br />The actual operating cost to use the EV charging stations is approximately $0.22 per kWh, <br />depending on usage. The operating costs include anticipated utilities, networking, and the <br />equipment warranty. Below is a summary of anticipated annual costs per charging station along <br />with anticipated revenue. <br />Expenses: - Total - $2,407 (estimated) Revenue: <br />Utilities - $1,100 (costs not included in agreement) User charges - $2,407 (estimated) <br />Network charges - $560 <br />Equipment Warrant - $747 not included in 1n ear <br />These ongoing revenue and expenditures will be tracked by site, and each location will be <br />budgeted for separately. Users of the stations will pay for the electric usage directly with <br />ChargePoint, Inc. Specifically, users of the stations will need to establish an account with <br />ChargePoint, Inc. to access the electric charging services. Voltaic will be providing all the net <br />revenue collected, related to electric service charges, to the City on a monthly basis. All revenue <br />collected will be deposited back into the fund/location that is paying for the estimated expenses. <br />25E-2 <br />Location <br /># of Dual <br /># of Parking <br />EV Stations <br />Stalls <br />Corporate Yard (City <br />use only) <br />2 <br />4 <br />215 S. Center St. <br />Birch St <br />Parking <br />Structure <br />1 <br />2 <br />Downtown <br />— 310 N. <br />Birch St. <br />Main St <br />Parking <br />Structure <br />1 <br />2 <br />Downtown <br />— 420 N. <br />Main St. <br />5"' Street <br />Parking <br />Structure <br />2 <br />4 <br />Downtown <br />— 300 E. <br />51 St. <br />ChargePoint, Inc. provides a networked approach to EV purchases, where charging locations <br />and payments are made available on a real-time basis on the user's smartphone or vehicle <br />navigation system. Additionally, all EV charging station usage data is available to the City in a <br />cloud environment and include a wide variety of reports to help provide an ongoing review of <br />each station, including revenues received and actual electrical costs. The proposed purchase <br />includes a five-year maintenance contract with Voltaic that includes all costs for networking, <br />upgrades and as -needed maintenance. <br />The actual operating cost to use the EV charging stations is approximately $0.22 per kWh, <br />depending on usage. The operating costs include anticipated utilities, networking, and the <br />equipment warranty. Below is a summary of anticipated annual costs per charging station along <br />with anticipated revenue. <br />Expenses: - Total - $2,407 (estimated) Revenue: <br />Utilities - $1,100 (costs not included in agreement) User charges - $2,407 (estimated) <br />Network charges - $560 <br />Equipment Warrant - $747 not included in 1n ear <br />These ongoing revenue and expenditures will be tracked by site, and each location will be <br />budgeted for separately. Users of the stations will pay for the electric usage directly with <br />ChargePoint, Inc. Specifically, users of the stations will need to establish an account with <br />ChargePoint, Inc. to access the electric charging services. Voltaic will be providing all the net <br />revenue collected, related to electric service charges, to the City on a monthly basis. All revenue <br />collected will be deposited back into the fund/location that is paying for the estimated expenses. <br />25E-2 <br />