My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT BICYCLE PROJ CONSULTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
01/15/2019
>
25G - AGMT BICYCLE PROJ CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 7:01:53 PM
Creation date
1/10/2019 6:57:41 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
1/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
guidelines and in Microstation V8i Computer Aided design and Drafting (CADD) format. <br />The horizontal datum shall be NAD 83 and the vertical datum shall be NAVD 88. <br />D. WATER QUALITY. The Consultant shall coordinate with the City for the Low Impact <br />Development (LID) requirements on the project and to prepare a Water Quality Management <br />Plan (WQMP) for the project. Consultant shall provide BMPs with appropriate size based on <br />treatment and peak flow rates, freight to job site and one year of maintenance to include units <br />and cost in the engineer's cost estimate. <br />The selection of Best Management Practices (BMPs) will always be subject to site specific <br />conditions and the Consultant will be required to perform the research into the site specific <br />conditions (e.g. prior contamination, depth to groundwater, soil conditions, interfering <br />utilities, etc.) that could preclude infiltration. The Consultant shall also perform the required <br />soils and/or infiltration testing per the Technical Guidance Documents, as necessary to <br />design the infiltration system assuming it is the selected LID approach. <br />Please find information and links to relevant documents and regulations at the following site: <br />http://ocwatersheds.com/documents/wgmp. <br />E. PLANS, SPECIFICATIONS, AND ESTIMATES (PS&E) <br />1. Development of Plans, Specifications and Estimate (PS&E): <br />a) All reports, plans, specifications and quantity calculations shall conform to criteria, <br />policies, procedures and standards of the City. The Consultant shall use the <br />boilerplate for cut sheets, specifications and estimates provided by the City. <br />b) The plan development shall include four (4) milestone deliverables -30%, 60%, <br />95% (pre -final) and 100% (final). All plan sheets shall be prepared at 20 scale <br />unless noted otherwise. The necessary plans for each PS&E package shall include, <br />but not be limited to: <br />1. Title Sheet (City boiler template) <br />2. Typical Cross Sections <br />3. Street Improvement Plan (Layout, Profile) <br />4. Construction Details <br />5. Channelization Plan (40 Scale) <br />6. Landscape & Irrigation Plan <br />c) All calculations for the design and quantities shall be submitted as part of the PS&E <br />submittal requirements. Quantities for all contract pay items shall be substantiated <br />by calculations. Quantity calculations shall be neat and orderly and shall show all <br />sketches, diagrams, and dimensions necessary to allow them to be independently <br />used by field inspectors during construction. All quantity calculations shall be <br />independently checked and substantiated with independent calculations. <br />d) Electronic files for all CADD (in Microstation V8i), reports, and calculations shall <br />be submitted at the end of the contract or when requested by the City. <br />City of Santa Ana RFP 18-072 <br />
The URL can be used to link to this page
Your browser does not support the video tag.