My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75E - PH - 2525 N. MAIN ST._ADJOURNED
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
02/19/2019
>
75E - PH - 2525 N. MAIN ST._ADJOURNED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 3:12:32 PM
Creation date
2/14/2019 2:23:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75E
Date
2/19/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIR No. 2018-01, DA No. 2018-01, GPA No. 2018-06, <br />AA No. 2018-10 2525 North Main Street <br />February 5, 2019 <br />Page 15 <br />center with a strong presence in the region. The project is not in character with the neighborhood, <br />which it shares two sides with, as the neighborhood is comprised of single-family dwellings and the <br />project is a high density multi -family housing project. The proposed project however, has a modern <br />contemporary design with a variety of materials that would fit the design intent of North Main Street. <br />It is common for high density multi -family projects to have a different architectural style than <br />surrounding single-family dwellings as the architectural styles of single-family homes often do not <br />translate well to multi -storied buildings. <br />Historic Neighborhood <br />The City of Santa Ana has two National Register Districts, Downtown Santa Ana and French Park. <br />Park Santiago is not a registered historic district. A total of 32 historic homes have been <br />documented in Park Santiago of the approximately 1,173 homes in the neighborhood with the <br />majority of the homes being more than 50 years old. As part of the EIR (Section 4.4), Cogstone <br />prepared a Historic Resources Report and concluded that the historic homes in Park Santiago will <br />not have the setting and feeling aspects of integrity reduced by construction of the proposed project <br />and thus there is no reduction in the historic significance of the homes. Future opportunity for the <br />neighborhood to become a historic district remains and is a public benefit deal point in the <br />Development Agreement. <br />Project Access <br />Vehicular access is proposed via a driveway on Main Street which would only allow for right -in and <br />right -out turn movements as Main Street has a median that separates north -south street traffic. As <br />proposed, to enter the site when traveling southbound on Main Street residents would have to <br />make a U-turn at Edgewood Road, and to exit the development and travel southbound on Main <br />Street residents would have make a right-hand turn (northbound on Main Street) and make a U- <br />turn at Walkie Way or Main Place Drive. The Traffic Impact Analysis prepared for the project <br />analyzed the impacts of having Main Street as the sole and primary access point and found that <br />operations would not exceed a threshold of significance (DEIR Access Option A). <br />Use of Santiago Park for Access <br />The applicant is proposing secondary access through Santiago Park which would utilize the <br />existing traffic signal at Main Street and Walkie Way/Santiago Park Drive. This would allow for all <br />directional movements to and from the property and reduce the U-turn movements described <br />above. This access option is not a required element for the project, however it was studied as a <br />secondary access option (DEIR Access Option B) in the Traffic Impact Analysis and found to have <br />a less than significant impact. <br />Various portions of the park were developed with Land & Water Conservation grant funding. As a <br />result, a 6(f)(3) boundary map placed the entire park under federal protection to be preserved as <br />outdoor recreational use. Any proposed changes to the park, such as the proposed vehicular <br />access, will require review by the City's Parks & Recreation Department, the Office of Grants and <br />Local Services and National Park Service and replacement of land with new park land of equal <br />75E-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.