Laserfiche WebLink
EXHIBIT B — OUTLINE SPECIFICATIONS <br />DIVISION 1 <br />viewing access to the LEED-Online workspace during design and throughout <br />the time of the lease. <br />2) Prior to the end of the first year of occupancy, if the Lessor fails to achieve <br />LEED Silver certification, the State may assist the Lessor in implementing a <br />corrective action program to achieve LEED certification and deduct its costs <br />(including administrative costs) from the tent. <br />d) When LEED certification is obtained, the Lessor shall provide two original LEED <br />rorfifirQfn, to C <br />F. Prevatlin _,�p wage: For those projects defined as "publicworks" pursuant to Labor Code <br />§17Q2, Lessor/contractor shall comply with prevailing wage requirements and be <br />subject to` restrictions and penalties in accordance with §1770 at seq, of the Labor Code <br />which; requires prevailing wages be paid to appropriate work classifications in' all bid <br />specifications and subcontracts. <br />G. 'Project schedule: Upon execution of the lease, Lessor shall issue to DGS a complete and <br />detailed Critical Part Method (CPM) schedule for the project, which may beadjusted by <br />mutual agreement as the project proceeds. The schedule shall include allowances for <br />periods of time' necessary for the installation of State-owned equipment and modular <br />systems furniture. <br />H. Construction costs:,Pdor to construction, Lessor shall provide to the State competitive <br />bids from at least three licensed contractorstsubcontractors and shall contract with the <br />lowestacceptablebidder. The bids shall include all charges such as (but not limited to) <br />labor, materials,3ool% equipment, fees, taxes, shipping, handling, permits, inspections, <br />and fabrication for the work defined in the lease exhibits. The bids shall also inciude'any <br />architectural and engineering fees. The bids shall be itemized unit cost construction <br />estimates developed by` using the Construction Specification Institute (CSI) format, titles, <br />and numbering stam. Lump sum cost estimates are not acceptable. <br />New shell condition: The following items shall be provided by the Lessor and shall not be <br />construed as tenant improvements:' ' <br />1. Exterior window coverings <br />2. Capital improvements to the building's core and shell <br />3. Building's perimeter walls and core walls with drywall finish ready for paint <br />4. Fire sprinkler main loop including drops and heads <br />5. Electrical service at a minimum of 5 watts per square foot <br />6. HVAC equipment and ducting to the premises <br />7, Code -required toilet room facilities <br />8. Americans with Disabilities Act (ADA) and California Building Code (CBC) compliance <br />work to correct all deficiencies to comply with current code. <br />Rev. March 2019 <br />RIX <br />