Laserfiche WebLink
DIVISION 2 - STATE FIRE MARSHAL PROCEDURE <br />D. A copy of the Permit Application form and all submittals shall be sent to: <br />Office of State Fire Marshal, Fire and Life Safety <br />2251 Harvard Street <br />Sacramento, California, 95815 <br />Contact telephone: (916) 445-8550. <br />This form must be filled out completely, including all Applicant and Building <br />Contractor information. Plan review time is typically to 8 weeks; however, the <br />architect shall verify the estimated review time for this project review at submittal. <br />The architect shall make the necessary adjustments to the overall project schedule <br />accordingly:. <br />E. The construction documents will be returned to the address shown under Applicant <br />Information, on the Permit Application and will be accompanied by eithera SFM Plan <br />Review Approval or a SFM Plan Review Transmittal with a list of deficiencies. <br />Upon completion of plan review, the Lessor/architect shall provide a copy of the SFM <br />Plan Review'Approval letter to the RESD Space Planner. <br />rw <br />2.03 CONSTRUCTION INSPECTION <br />A. The regional SFM office will inspect and approve the construction in the State leased <br />puilding. There are two fire life safety regions; North and South. The final SFM <br />approved construction documents will include all inspection contact information and <br />Will be emailed via the GOVmotus website to the Lessor. To request a SFM <br />lnspectionfor your site; provide a minimum of 24 to 48 hour notice prior to the <br />inspection date. The inspections must be requested on the GOVmotus website. The <br />Lessor, architect, or contractor shall be responsible for logging into the GOVmotus <br />website, <br />and requesting inspections. <br />B. After completion of each successive SFM construction inspection, any deficiencies <br />shall be recorded on the SFM Fire Safety Correction Notice by the-SFM assigned <br />Deputy and emailed to the Lessor by the SFM. A copy of the inspection notice will <br />be immediately available -on the GOVmotus website. This form is to be signed by a <br />Lessor'sreprasentative on site. Final approval by the Deputy SFM is recorded on <br />this document and a SFM Certificate of Occupancy is then issued. The Lessor or <br />Lessors contractor shall send a copy to the RESD Space Planner. <br />End of SFM Process <br />5 (Rev-Y19) <br />