My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA, STATE OF EMPLOYMENT DEVELOPMENT DEPARTMENT (2)
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA, STATE OF
>
CALIFORNIA, STATE OF EMPLOYMENT DEVELOPMENT DEPARTMENT (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 8:39:57 AM
Creation date
5/29/2019 10:06:04 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA, STATE OF EMPLOYMENT DEVELOPMENT DEPARTMENT
Contract #
A-2019-072
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
5/7/2019
Expiration Date
6/30/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 3 — CBC/ADA ACCESS COMPLIANCE PROCEDURE <br />1. DSA certified accessibility consultants trained for Leased facilities <br />https://www.dqs.ca.gov/RESD/Resources/Page-Content/Real-Estate <br />Services-Division-Resources-List-Folder/Lease-Requirements <br />2. Certified Access Specialist (CASp) <br />https://www.apps2.dqs.ca-gov/DSA/casp/casp certified list aspx <br />3. ICC Accessibility Inspector/Plans Examiner <br />https://www.icosafe.6rq/search-for-certified-professionals/ <br />4. Architect licensed in the State of California <br />A.1.1 The consultant will survey the facility and site per CCR Title 24, California <br />Building Code (CBC), and Americans with Disabilities Act (ADA). State agencies are <br />public entities and shall comply with Title II of.the ADA. Exceptions to the code for <br />existing buildings are not permitted. Access compliance shall apply,(o exterior areas <br />such as but not limited to path of travel to and from public' transportation and public <br />right-of-way; parking, passenger drop-off and loading zones, walks and sidewalks, <br />curb ramps; ramps, and all stairs. Access compliance shall also apply to interior <br />areas such as but not limited to entrances and exits, lobbies, buijding,common'areas, <br />' elevators, access lifts, doors and gates, access to and through alLrooms and spaces, <br />restrooms, signs and identification, counters, waiting, seating areas, assistive <br />listening systems, telephones, drinking"fountains, alarms, and horizontal%vertical <br />access. Consultants will observe and record all deficiencies, as well as provide <br />solutions needed to bring facility into compliance with sufficient detail to allow Lessor <br />or his/her agent to develop a cost estimate for proposed barrier removal. Should all <br />areas mentioned above not be fully constructed, consultants shall review the <br />- construction documents in addition to the physical evaluation. <br />B. Fee Payment: The Lessor shall prepare'a check payable to the Dept. of General <br />Services Real Estate Services Division. Lessor shall enclose a copy of the <br />CSC/ADA Access Compliance Fee Calculation Form E (attached) as prepared by <br />the RESD Space Planner, along with payment and mail to DGS, RESD (Include the <br />project~number on the check to RESD). <br />C. Construction Documents: The Lessor's Architect will incorporate all items defined in <br />the accessibility, survey Into the construction documents. The Lessor shall submit the <br />completed drawings to RESD for review. <br />D. Verified Report: Following the completion of construction, the Lessor's architect is <br />responsible for verifying that the Items ;outlined "in the accessibility survey and <br />incorporated, into the construction documents have been completed. The Verified <br />Report Fornj G (attached) shall be signed by the Lessor's; architect. The architect <br />shall forward the signed Verified Report to RESD Space Planner prior to the final <br />inspection that will be performed by RESD. The project will not be accepted for <br />occupancy prior to receipt of this document. <br />End of Group 9 Procedure <br />077 (revans) <br />
The URL can be used to link to this page
Your browser does not support the video tag.