My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
UTILIWORKS CONSULTING, LLC.
Clerk
>
Contracts / Agreements
>
U
>
UTILIWORKS CONSULTING, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2022 9:19:47 AM
Creation date
6/10/2019 1:44:48 PM
Metadata
Fields
Template:
Contracts
Company Name
UTILIWORKS CONSULTING, LLC.
Contract #
A-2019-066
Agency
PUBLIC WORKS
Council Approval Date
5/7/2019
Expiration Date
5/6/2023
Insurance Exp Date
6/14/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Review and provide feedback on vendor and utility test cases for each phase to identify <br />potential gaps and supplement accordingly <br />• Aggregate test cases provided by each vendor and the City for each phase <br />• Coordinate scheduling and execution of the testing by each vendor and the City <br />• Provide onsite testing oversight and support of the test team <br />• Establish an issue/defect tracking system, monitor defects/problems reported by the <br />test team, facilitate assignment of problems for resolution, and ensure retest by the <br />test team <br />Assumptions: UtiliWorks will oversee Utility personnel onsite during testing and can, but will not be <br />required to, perform some testing with the City's permission and appropriate access to systems. <br />UtiliWorks will not build out detailed test scripts but will support the City in their efforts. <br />Deliverables: Integrated Test Plan (*.doc), Supplemental Test Cases (*.xls), Issue/Defect tracking <br />system (Share Point) <br />Task 1.6 - Oversee Systems Integration <br />UtiliWorks will coordinate and oversee the systems integration effort that will occur during the <br />POC phase. The intent is to have the pre -identified systems interfaces designed, developed, <br />tested and automated prior to full deployment start. UtitiWorks will lead a kickoff integration <br />workshop with Santa Ana staff and the designated vendor(s) personnel to identify and confirm <br />the security requirements and network architecture; systems -specific integration methodology; <br />and begin the discussion on file layouts and interface requirements. <br />Following the kickoff, UtiliWorks will lead weekly technical review meetings with all designated <br />personnel internal and external to Santa Ana to monitor progress and identify roadblocks to <br />systems integration activities. <br />Assumptions: Designated SME's from Santa Ana, each Vendor, and any third -party integrator will <br />participate in the workshop(s) and the weekly status meeting <br />Deliverables: High-level systems integration diagram (*.vsd), Weekly meeting notes and <br />integration activities tracker(s) <br />Task 2- Business Process Re -Engineering <br />UtiliWorks will engage Santa Ana in a series of workshops, designed to guide the Utility through <br />changes to internal business processes as part of an AMI Deployment. To achieve the anticipated <br />benefits of the systems, the City will need to adopt new processes. Vendors will often skim <br />over recommendations detailing changes specific to business processes. UtiliWorks will utilize <br />the background information on the City, including goals and objectives, to help drive discussion <br />around operational changes that are the successful foundation for a Business Process Re - <br />engineering (BPR) effort. <br />This effort is also an important step for Change Management, since a wide range of employees <br />and staff will be involved in BPR activities. In fact, this is an opportune time to get employees <br />involved on the "ground -level." Many of the changes recognized during BPR workshops are the <br />direct result of new technology and systems that will fundamentally change the way the Utility <br />operates. As part of the BPR effort, the UtiliWorks team will work to identify redundancies in <br />The City of Santa Ana Page 1 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.