Laserfiche WebLink
Accurate recording and timely delivery of serial numbers, out reads, start reads, meter and <br />endpoint characteristics, geographic co-ordinates, digital pictures, and install notes to the <br />appropriate departments and systems at the City is key to full deployment success. UtiliWorks <br />will work with the City and the Installation Contractor to develop the strategy and processes to <br />monitor for tight control and provide a thorough audit of data to ensure a smooth transition to <br />billing with AMI data, <br />To ensure a successful deployment, it is necessary to detail and document the numerous aspects <br />of the Full Deployment phase. UtiliWorks will work with the designated City staff and vendor <br />staff to develop a detailed Full Deployment Plan. At a minimum, this plan will detail processes <br />and procedures for: <br />• Inventory acquisition, supply chain and logistics <br />• Contract employee protocols <br />• Mass meter change out (Deployment) <br />• Communications and reporting <br />• Field installation quality assurance and audit <br />• Data quality assurance and audit <br />UtiliWorks will manage and oversee the selected installation contractor and represent the City's <br />interests accordingly. Specific project management, logistics, training, troubleshooting, and <br />quality assurance tasks to be performed by UtiliWorks during the full deployment phase are <br />outlined in detail below: <br />Project Management <br />o Represent the City regarding management of AMI vendor and their contractors <br />and provide input on change orders and scope creep <br />o Work with the City and the Installation contractor project manager to set <br />production goals and monitor goal versus actual. <br />o Assist the City with scheduling internal installs and provide additional AMI <br />device training as needed. <br />o Review and adjust schedule as needed based, inventory and Return to Utility <br />(RTUs). Provide insight that allows for flexibility in scheduling in a timely <br />manner. <br />o Conduct a detailed review of the Installation contractor monthly invoice <br />o Lead weekly Web based production status meetings with designated staff from <br />the City, Installation contractor, UtiliWorks and AMI vendor. <br />o Provide weekly status reports to the Santa Ana Project Manager to include <br />weekly production updates, RTU's, Quality Audit findings, safety reviews, field <br />related issues and general discussion <br />o Meet with the Santa Ana PM weekly to review project status. <br />Materials Management <br />o Work with the installation contractor and the City to develop the necessary <br />processes to accurately disperse, track, and report on the movement of <br />equipment from warehouse through to installation. <br />o Ensure that vendor shipments to the City are timely, work with vendors to ensure <br />lead times don't affect production schedule, work with installation contractor <br />PM to ensure a rolling 6-week inventory. <br />o Work with the City to ensure inventory levels are updated and accurate, <br />disposition of RTU's on a regular (weekly/bi-weekly) basis. <br />The City of Santa Ana Page 1 12 <br />