My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitor <br />1983 Final EIR <br />Applicable to MalnPlace Mall <br />(Signature <br />Mitigation Measures <br />Transformation Mitigation <br />Responsibility <br />Timing <br />Required) <br />(MMs) <br />Program? <br />(Date of <br />Compliance) <br />facilitate easy <br />movement of people <br />between buildings. <br />Vehicular traffic must <br />be intercepted at <br />major entrances along <br />the public service <br />road and channelized <br />quickly to parking <br />areas. Convenient <br />pedestrian facilities <br />must be provided <br />from the parking <br />areas to the buildings <br />and to the transit <br />station/bus stops. <br />Final EIR Section 5.9: Shade/Shadow, Solar Glare, Illumination <br />5.9-1: Development <br />Not applicable: The mitigation <br />plans submitted to <br />measure is not applicable to the <br />the Agency for <br />MainPlace Project and therefore <br />approval pursuant to <br />does not need to be carried <br />the Participation <br />forward. The Fashion Square <br />Agreement should be <br />Commercial Center Final EIR <br />accompanied by a <br />concluded that depending on the <br />shade/shadow <br />height and location of buildings, <br />analysis in order to <br />the project could have shade/ <br />determine the best <br />shadow impacts to surrounding <br />building locations and <br />land uses, including residential <br />heights for the <br />areas. The EIR analysis looked at <br />structures which <br />three residential development in <br />could result in the <br />the project area and concluded <br />least shade/shadow <br />that the project could have <br />impact, if any, to the <br />significant and unavoidable <br />surrounding land <br />shade/ shadow impacts. That <br />uses. <br />conclusion was based on the fact <br />that there was "no absolute <br />height limit" applicable to <br />development of the project. <br />The Specific Plan Project would <br />restrict buildings fronting Main <br />Street to a maximum of 20 stories, <br />and buildings on all other portions <br />of the project site to a maximum <br />Resolution No. 2019-040 <br />Page 17 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.