Laserfiche WebLink
Water Quality Management Plan (WQMP) <br />Mainplace Mall Specific Plan <br />Section IV Best Management Practices <br />(BMPs) <br />IV. 1 Project Performance Criteria <br />Describe project performance criteria. Several steps must be followed in order to determine <br />what performance criteria will apply to a project. These steps include: <br />• If the project has an approved WIHMP or equivalent, then any watershed specific <br />criteria must be used and the project can evaluate participation in the approved <br />regional or sub -regional opportunities. (Please ask your assigned planner or plan <br />checker regarding whether your project is part of an approved WIHMP or <br />equivalent.) <br />• Determine applicable hydromodification control performance criteria. Refer to <br />Section 7.11-2.4.2.2 of the Model WQMP. <br />• Determine applicable LID performance criteria. Refer to Section 7.11-2.4.3 of the <br />Model WQMP. <br />• Determine applicable treatment control BMP performance criteria. Refer to Section <br />7.11-3.2.2 of the Model WQMP. <br />• Calculate the LID design storm capture volume for the project. Refer to Section 7.11- <br />2.4.3 of the Model WQMP. <br />(NOC Permit Area only) Is there an approved WIHMP or equivalent <br />for the project area that includes more stringent LID feasibility <br />YES ❑ <br />NO <br />criteria or if there are opportunities identified for implementing LID <br />on regional or sub -regional basis? <br />In <br />Centennial Section IV <br />Conceptual Specific Plan WQMP Page 19 <br />