My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2966
Clerk
>
Ordinances
>
2011 - 2020 (NS-2813 - NS-3000)
>
2019 (NS-2963 - NS-2978
>
NS-2966
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 4:58:39 PM
Creation date
6/21/2019 4:40:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2966
Date
6/18/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TTT <br />Installation of a traffic signal at the intersection of Bedford <br />Road and realigned Main Place Drive. <br />Restriping and reconfiguration of lanes at the intersection with <br />Bedford Road. This will require a small dedication. Lane <br />configurations may change at the intersection. This would not <br />require an amendment to the specific plan (see Figure 2-8, <br />Bedford Road Restriping). <br />No sidewalks are present or proposed within the existing right- <br />of-way of Main Place Drive, as the right-of-way generally ends <br />at the back of curb. A 5-foot sidewalk and 5-foot parkway will <br />be provided on the project side of Main Place Drive, within a <br />public use easement. <br />Resurfacing of Main Place Drive along its length, completed in <br />phases as fronting projects develop subject to paving analysis. <br />Restriping of Main Place Drive between Bedford Road and <br />Broadway to accommodate an on -street (Class II) bike lane. <br />This restriping will result in two travel lanes, a center <br />continuous turn lane and bike lanes on both sides of the street. <br />However, the segment between Bedford Road and the first <br />driveway will remain a four -lane roadway with striped bike <br />lanes (see Figure 2-9, Cross Section). <br />C. Bedford Road <br />Bedford Road is a public local roadway which connects to Main Place <br />Drive, crosses SR 22 freeway, and intersects with La Veta Avenue in <br />the City of Orange to the north. It is a two-lane roadway with a <br />sidewalk on its western side, is stop -controlled at Main Place Drive <br />and striped with a left turn lane and a combined through/right turn <br />lane. The bridge over SR 22 is a Caltrans facility. <br />Improvements to Bedford Road include the following: <br />Restriping of the southbound lanes to provide a dedicated right <br />turn lane and a combined left/through lane. Striping <br />_J <br />R. <br />1 <br />IJI <br />DEVELOPMENT PLAN 1 2 <br />Figure 2-8 Bedford Road Restriping <br />configuration may change. This would not require an <br />amendment to the specific plan. <br />Installation of a traffic signal at the intersection of Bedford <br />Road and the realigned private segment of Main Place Drive. <br />D. broaaway <br />Broadway is identified in the City's Circulation Element as a <br />Secondary Arterial. It extends to Main Place Drive from the south, <br />terminating at a signalized intersection. Broadway provides direct <br />access from downtown Santa Ana to the Specific Plan area, crossing <br />Interstate 5 at a grade -separated crossing. No improvements to <br />Broadway are anticipated as part of the Specific Plan. There is an <br />existing traffic signal at Broadway and Main Place Drive. <br />MAINPLACE SPECIFIC PLAN 1 2-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.