My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT TRAFFIC SIGNAL MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
25D - AGMT TRAFFIC SIGNAL MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:17:27 PM
Creation date
6/27/2019 5:05:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
7/2/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
condition). <br />• Battery System: <br />Contractor shall check system operating voltage and battery life. <br />Notify the City if battery needs replacement. <br />• Field Equipment <br />The Contractor shall check LED display, poles, and standards <br />The contractor shall check and ensure that LED display, strobes, and <br />radar detection equipment are in working order. <br />Contractor shall check and notify the City of any missing or damaged <br />traffic signs mounted on the traffic signal poles. <br />Clean the solar panels in accordance to the manufacturer's <br />recommendation. This is required to be done once every 6 months. <br />• Maintenance Record <br />The Contractor shall maintain a record log in each controller cabinet <br />showing the date and time of any service. It shall consist of: <br />a. Routine Maintenance <br />b. Extraordinary Maintenance <br />All records shall be legibly written orprinted. These record logs shall <br />become property of the City. <br />6. Extraordinary Maintenance <br />Extraordinary maintenance includes work tasks to install new, replace or repair <br />defective or obsolete equipment and perform modification work not directly <br />covered by routine maintenance. Work shall be performed with prior City <br />approval unless emergency or public safety conditions require immediate <br />response. <br />7. Emergency Service <br />The Contractor shall provide emergency service to the City twenty-four hours a <br />day, seven days a week upon City's request. Unless stated by the City at the time <br />of request, the contractor will need to ascertain whether request is of an emergency <br />nature requiring immediate response. <br />Failure or malfunction of the traffic signal or interruption of normal operation as to <br />create confusion or public hazard is considered emergency nature. <br />(a) The contractor shall provide qualified personnel at the location within 30 <br />minutes of receiving emergency request. <br />(b) The Contractor shall immediately troubleshoot and restore the traffic signal to <br />normal operations. If that is not possible due to the extent of the damage, <br />sufficient temporary repairs shall be made to enable the intersection to operate <br />safely. In no event shall the traffic signal be left overnight in dark mode (black <br />out). <br />City of Santa Ana RFP 19-023 <br />Page A1-6 <br />25D-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.