My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT TRAFFIC SIGNAL MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
25D - AGMT TRAFFIC SIGNAL MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:17:27 PM
Creation date
6/27/2019 5:05:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
7/2/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) For intersections with power outages, The Contractor shall use the following <br />procedure: <br />(i) Setup temporary stop signs at all approach upon arrival at the site. <br />(ii) Turn off the traffic signal controller and place cabinet control to flashing <br />operation. <br />(iii) Once the power is restored, remove all stop signs and return the traffic <br />signal to normal operation. <br />8. Compensation For Routine And Extraordinary Maintenance <br />(a) Routine Maintenance: <br />Compensation for routine maintenance of traffic signal system shall be per <br />contracted unit price. Said compensation shall include all labor, material, <br />equipment and overhead/profits. <br />(b) Extraordinary Maintenance: <br />Compensation for extraordinary maintenance of traffic signal system shall be <br />per contracted unit price. Said compensation shall include all labor, material, <br />equipment and overhead/profits. <br />For work not listed in the bid list, compensation shall be based on agreed lump <br />sum price or time and material basis. <br />(i) Materials: The City shall pay the Contractor for materials used in <br />extraordinary maintenance, the Contractor's cost from the supplier plus the <br />percentage specified in the Contractor's bid proposal. All materials and <br />parts shall be new or have the approval of the Traffic Engineer. <br />The City has the right to inspect the Contractor's records to verify any <br />material costs used in extraordinary maintenance <br />(ii) Direct Labor: The Contractor shall present with his monthly invoice a <br />record of hours spent in extraordinary maintenance of traffic signals and <br />appurtenances per intersection. City shall pay the Contractor for such <br />hours of extraordinary maintenance at the rates specified on the <br />Contractor's bid proposal. Said hourly rates shall be the total cost to City. <br />Rates shall include all compensation for wages, profit, overhead, any fringe <br />benefits such as employer payments to, or on behalf of, work for health and <br />welfare, insurance, worker's compensation, pension, vacation, sick leave or <br />any local, state, federal, or union tax or assessment. <br />(iii)Equioment: City shall pay the Contractor for equipment used in <br />extraordinary maintenance on ajob-trip basis rate as specified in the <br />Contractor's bid proposal. The Contractor's job -trip equipment rates shall <br />constitute the rates to be paid by the City when the specified equipment is <br />used for the extraordinary maintenance. As used herein, job -trip shall <br />mean the furnishing of the required equipment at the site of extraordinary <br />maintenance work for the duration of the work. No additional <br />compensation shall be paid for transporting equipment to or from the job <br />site. <br />9. Meetine <br />City of Santa Ana RFP 19-023 <br />Page Al-7 <br />25D-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.