My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - ENGINEERING TECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/16/2019
>
25F - AGMT - ENGINEERING TECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:04:18 PM
Creation date
7/11/2019 4:58:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
7/16/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency: Los Angeles County Flood Control District <br />Contract Tltie: Rio Hondo Dam Cleanout <br />Scope of services: Mr. Lopez provided inspection of debris removal, dam diversion, regrading of <br />low flow and exporting of soil. This was a $25 million project in coordination with the Army Corps of <br />Engineers and the Department of Fish and Game. <br />Agency: Los Angeles County Flood Control District <br />Contract Title: Holly Hills Drain <br />Scope of services: Mr. Lopez provided inspection of 20' x 20' RCB running from the City of Los <br />Angeles Wilshire District to downtown Westwood. This was a $60 million project that Involved three <br />large construction companies and the coordination with the City of Los Angeles. <br />Additional Federal Street Resurfacing Project for City of Anaheim: <br />• Crescent Street from Magnolia to Gilbert - $750,000 <br />• Katella Avenue from Nutwood to Gilbert, $850,000 <br />• Euclid Street from Polais to Katella, $900,000 <br />• Brookhumt from Orange to Katella, $700,000 <br />• La Palma Avenue from Lakeview to Imperial Highway, $2.5 million <br />• Imperial Highway from Santa Ana Canyon to Nohl Ranch Road, $850,000 <br />• Santa Ana Canyon Road from Imperial to Fairmont, $1.2 million <br />• Santa Ana Canyon Road from Festival to Weir Canyon Road, $500,000 <br />• Weir Canyon Road to the Burlington Northern Santa Fe Railroad Bridge, $ 750,000 <br />• Nohl Ranch Road from Serrano to Walnut, $1.5 million <br />• Orangethorpe Avenue from Kraemer to Miller, $900,000 <br />Additional Electrical Projects for City of Anaheim: <br />• Underground District 26, Euclid to Broadway, $5 million <br />• Park Substation Transmission and Distribution, $15 million <br />• Roosevelt Substation and Gateways, $80 million <br />• Yorba Substation Transformer Update, $30 million <br />• Underground District 50, Euclid Avenue from Broadway to Orangewood, $15 million <br />Additional Traffic Signal Projects for City of Anaheim: <br />• Westchester/ Lincoln, $175,000 <br />• Western Avenue Pedestrian, $175,000 <br />171Page <br />25F-169 <br />
The URL can be used to link to this page
Your browser does not support the video tag.