Laserfiche WebLink
APPENDIX -RESUMES <br />Restoration, City Pool Maintenance, Various other City facility <br />maintenance). Cost $2.5m <br />City of Temple City, Assistant City Engineer (Transtech serves <br />as Contract City Engineer): Mr. Demirci serves as Assistant City <br />Engineer. His main responsibilities include managing City's CIP <br />program. Mr. Demirci prepares PS&E packages for various City <br />projects and manages CIP projects from project inception to project <br />closeout. Highlighted projects are: <br />o City's Annual Pavement Management Program: Prepared <br />and managed City's PMP since 2013. He coordinated in <br />preparation of bid packages following recommendations from <br />PMP and managed projects in PE and CE phases. Annual <br />cost: $1.5m <br />o Pedestrian and Bike Safety Improvements on Temple City <br />Blvd, El Monte and Various Locations Citywide (HSIP <br />Federally Funded): Worked as project manager in PE and CE <br />phases of federally funded projects. These projects were <br />managed In compliance with applicable federal requirements. <br />Cost: $1.5m <br />City of Cudahy, CIP Manager/Coordinator: Mr. Demirci serves as <br />CIP Program Manager/Coordinator. As part of his responsibility, Mr. <br />Demirci prepares PS&E packages, coordinates bid advertisement, <br />bid opening, bid analysis, contract award, pre -construction meetings, <br />construction phase coordination, post construction project close out, <br />and state/federal projects grant closeout activities. Highlighted <br />projects are: <br />o Pedestrian Safety Improvements, (ATP Funded): Served as <br />Project Manager for this federally funded $1.Om project. <br />Project includes construction of pedestrian safety <br />improvements such as curb extensions, installation of traffic <br />devices, signs, striping. <br />o Lugo Park, Soccer Field Project (CDBG Federally Funded): <br />Served as Project Manager for this $1.6m federally funded <br />project. Project includes construction of a regulation new <br />soccer field with artificial turf on existing baseball field, DG <br />walking path, landscaping, parking lot expansion, concrete <br />plaza, lighting, drainage, bathroom and concession stand <br />ADA improvements. The project is CDBG federally funded <br />and being managed in compliance with applicable CDBG <br />requirements. Cost $1.6m <br />City of Commerce, CIP Manager/Coordinator: Mr. Demirci serves <br />as CIP Program Manager/Coordinator. As part of his responsibility, <br />Mr. Demirci prepares PS&E packages, coordinates bid <br />advertisement, bid opening, bid analysis, contract award, pre - <br />construction meetings, construction phase coordination, post <br />construction project close out, and state/federal projects grant <br />closeout activities. Highlighted projects are: <br />o Slauson Avenue ADA Improvements and Tree Replacement <br />Project: Served as Project Manager for this $1.2m ADA <br />Improvements and tree replacement project. <br />1s <br />PROPOSAL FOR TRAINsrEch <br />ENGINEERING, TECHNICAL AND ATIINPTRnATIVI SUPPORT SERVICES, RFP NO. 19-045 <br />