My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - ENGINEERING TECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/16/2019
>
25F - AGMT - ENGINEERING TECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 5:04:18 PM
Creation date
7/11/2019 4:58:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
7/16/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX -RESUMES 14 <br />o City's Annual Pavement Management Program: Managed <br />City's PMP since 2015. He coordinated in preparation of bid <br />packages following recommendations from PMP and <br />managed projects in PE and CE phases. Annual cost: $4,5m <br />City of Temple City, Council Chambers Renovation and ADA <br />Improvements Project: Served as Project manager for the <br />preparation of the plans, specifications and cost estimates and bid <br />package for the renovation and ADA Improvements of the Council <br />Chambers Building. The Improvements included complete <br />reconstruction/renovation of the Council Chambers with new seating, <br />dais, carpet, lighting, AV system, and new ADA compliant bathrooms, <br />new ADA compliant access to the building, new emergency <br />generator and electrical work, re -design of building creating a space <br />for Emergency Operations Center, asbestos removal, painting and <br />other various improvements. Cost approximately $0.5m. <br />City of Temple City, CDBG ADA Improvements Project: Served <br />as Assistant Project manager for the preparation of the plans, <br />specifications and cost estimates and bid package as well as field <br />reviews forADA and sidewalk Improvements at various locations thru <br />out the City under CDBG funds. Cost approximately $0.4m <br />• Deputy Project Manager, Supporting/Backup Office Engineer <br />for Rosemead Safety and Enhancement and ADA <br />Improvements Project: Served as one of the Office Engineers <br />for the Rosemead Safety and Enhancement Project. The project <br />included widening and reconstruction of 2 miles of Rosemead <br />Boulevard, including new medians, bike lanes, signals, sidewalks, <br />curb gutter, street lighting, landscape, street scape. The project <br />is federally funded and is managed in compliance with Caltrans <br />Local Assistance Procedures Manual. Cost $20m. <br />PROPOSAL FOR TRANS rECk <br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO. 19-045 <br />
The URL can be used to link to this page
Your browser does not support the video tag.