APPENDIX -RESUMES 34
<br />• University Park Development/San Bernardino: The project included 2
<br />miles of new roadway, sewer, water, utility and extensive hill side
<br />grading for a master planned residential and commercial development
<br />on 130-acre site across from the San Bernardino State University,
<br />Cost $40m.
<br />• City of Torrance, Crenshaw Reconstruction, Skypark Improvements,
<br />1901/Crenshaw Widening: Design, construction management
<br />services, including inspection, surveying, resident engineer, federal
<br />compliance, labor compliance. Project was funded by Federal Funds,
<br />and was managed and inspected In compliance with Caltrans Local
<br />Assistance Procedures Manual. Cost: $5 m.
<br />• Valley Boulevard Widening and Reconstruction project which is funded
<br />by State and Federal funds and required complete project and
<br />environmental report, including Right -of -Way, Relocation, SHPO,
<br />NEPA, SEQA, Noise, Parking, Economic, Hazardous Materials
<br />technical studies, and processed through Caltrans and FHWA.
<br />Construction cost ($6m).
<br />• Carlsbad to San Diego Rail Trail Project Report, which is funded by
<br />State and Federal funds and required complete project and
<br />environmental report, including Right -of -Way, Relocation, SHPO,
<br />NEPA, SEQA, Noise, Parking, Economic, Hazardous Materials
<br />technical studies, and processed through Caltrans and FHWA.
<br />• City of Commerce's Tubeway and Yates Avenue Rehabilitation
<br />Project. The projects involved roadway rehabilitation and
<br />reconstruction. Transtech also provided construction management
<br />services for the project. Cost: $300,000.
<br />• City of San El Monte Annual Street Rehabilitation Program, 98, 99, 00,
<br />01. The projects involved roadway rehabilitation and reconstruction,
<br />storm drain, water and sewer design on various streets. Cost:
<br />$3,000,000.
<br />• Alameda Corridor Agency East (ACE) Rail Grade Crossing
<br />Improvement Project encompassing 6 agencies and 14 locations in
<br />Los Angeles County. Work involved roadway realignment and
<br />reconstruction, signalization, traffic control, and construction phasing
<br />as well as related improvements such as storm drain, water, sewer
<br />landscaping, underground utilities, etc. Cost $5,000.000.
<br />• City of Alhambra Annual Street Rehabilitation Program, 94 through 01.
<br />The projects involved roadway rehabilitation and reconstruction, storm
<br />drain, water and sewer design on various streets. Transtech also
<br />provided construction management services for the project. Project
<br />Cost: $3,000,000. Project Principal for design of City of San
<br />Clemente's annual street rehabilitation program. The project involved
<br />roadway rehabilitation and reconstruction, storm drain, water and
<br />sewer design on various streets. Cost $1,000,000.
<br />• Reconstruction and rehabilitation of Crenshaw Boulevard and Skypark
<br />Avenue (two separate projects) in the City of Torrance. Cost
<br />$3,000,000.
<br />• Valley Boulevard street medians, striping, landscape, and Irrigation
<br />improvements, Alhambra, Cost $600,000.
<br />Traffic Engineering Experience
<br />PROPOSAL FOR rirnns�ch
<br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO. 19.045
<br />25F-274
<br />
|