Laserfiche WebLink
APPENDIX -RESUMES 34 <br />• University Park Development/San Bernardino: The project included 2 <br />miles of new roadway, sewer, water, utility and extensive hill side <br />grading for a master planned residential and commercial development <br />on 130-acre site across from the San Bernardino State University, <br />Cost $40m. <br />• City of Torrance, Crenshaw Reconstruction, Skypark Improvements, <br />1901/Crenshaw Widening: Design, construction management <br />services, including inspection, surveying, resident engineer, federal <br />compliance, labor compliance. Project was funded by Federal Funds, <br />and was managed and inspected In compliance with Caltrans Local <br />Assistance Procedures Manual. Cost: $5 m. <br />• Valley Boulevard Widening and Reconstruction project which is funded <br />by State and Federal funds and required complete project and <br />environmental report, including Right -of -Way, Relocation, SHPO, <br />NEPA, SEQA, Noise, Parking, Economic, Hazardous Materials <br />technical studies, and processed through Caltrans and FHWA. <br />Construction cost ($6m). <br />• Carlsbad to San Diego Rail Trail Project Report, which is funded by <br />State and Federal funds and required complete project and <br />environmental report, including Right -of -Way, Relocation, SHPO, <br />NEPA, SEQA, Noise, Parking, Economic, Hazardous Materials <br />technical studies, and processed through Caltrans and FHWA. <br />• City of Commerce's Tubeway and Yates Avenue Rehabilitation <br />Project. The projects involved roadway rehabilitation and <br />reconstruction. Transtech also provided construction management <br />services for the project. Cost: $300,000. <br />• City of San El Monte Annual Street Rehabilitation Program, 98, 99, 00, <br />01. The projects involved roadway rehabilitation and reconstruction, <br />storm drain, water and sewer design on various streets. Cost: <br />$3,000,000. <br />• Alameda Corridor Agency East (ACE) Rail Grade Crossing <br />Improvement Project encompassing 6 agencies and 14 locations in <br />Los Angeles County. Work involved roadway realignment and <br />reconstruction, signalization, traffic control, and construction phasing <br />as well as related improvements such as storm drain, water, sewer <br />landscaping, underground utilities, etc. Cost $5,000.000. <br />• City of Alhambra Annual Street Rehabilitation Program, 94 through 01. <br />The projects involved roadway rehabilitation and reconstruction, storm <br />drain, water and sewer design on various streets. Transtech also <br />provided construction management services for the project. Project <br />Cost: $3,000,000. Project Principal for design of City of San <br />Clemente's annual street rehabilitation program. The project involved <br />roadway rehabilitation and reconstruction, storm drain, water and <br />sewer design on various streets. Cost $1,000,000. <br />• Reconstruction and rehabilitation of Crenshaw Boulevard and Skypark <br />Avenue (two separate projects) in the City of Torrance. Cost <br />$3,000,000. <br />• Valley Boulevard street medians, striping, landscape, and Irrigation <br />improvements, Alhambra, Cost $600,000. <br />Traffic Engineering Experience <br />PROPOSAL FOR rirnns�ch <br />ENGINEERING, TECHNICAL AND ADMINISTRATIVE SUPPORT SERVICES, RFP NO. 19.045 <br />25F-274 <br />