Laserfiche WebLink
55394.00053\32005762.1 <br />1983 Final EIR Mitigation <br />Measures (MMs) <br />Applicable to MainPlace Mall Transformation <br />Mitigation Program? Responsibility Timing <br />Monitor <br />(Signature <br />Required) <br />(Date of <br />Compliance) <br />provide a Transportations <br />System Management <br />Coordinator to actively pursue <br />implementation of the <br />TSM/Parking Management <br />Program. This position need <br />not necessarily be on a full <br />time basis until such time as <br />implementation of a <br />substantial portion of the <br />proposed office use is <br />underway. <br />The developer also shall be <br />required to provide and <br />maintain a security force <br />whose task, among others, <br />shall be to enforce all on-site <br />parking regulations. <br />MM 5.6-8: A. Design buildings <br />to accommodate second level <br />access from a future transit <br />station on Main Street in the <br />vicinity of Town and Country <br />Road and/or a possible future <br />grade separated pedestrian <br />bridge connecting <br />developments on both sides of <br />Main Street. The buildings and <br />internal pedestrian circulation <br />Not applicable: Final EIR Mitigation Measure <br />5.6-8 was previously implemented. No <br />additional mitigation is required. No transit <br />station was ever built and none are currently <br />planned in this location. <br />-- -- --