My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-28-19
>
05-28-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:54:56 PM
Creation date
8/16/2019 4:53:24 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for Implementing the <br />California Environmental Quality Act (2019) ENVIRONMENTAL IMPACT REPORT <br /> <br /> <br />2019 City of Santa Ana Local Guidelines 7-23 ©Best Best & Krieger LLP <br />(c) Direct mailing of the Notice of Completion and/or the Notice of Availability to owners and <br />occupants of property contiguous to the project, as identified on the latest equalized <br />assessment roll. <br />The Notice of Completion and Notice of Availability shall be posted in the office of the <br />Clerk in each county in which the project is located for at least thirty (30) days. If the public <br />review period for the Draft EIR is longer than thirty (30) days, the City may wish to leave the <br />Notice posted until the public review period for the Draft EIR has expired. <br />Copies of the Draft EIR shall also be made available at the City office for review by <br />members of the general public. The City may require any person obtaining a copy of the Draft <br />EIR to reimburse the City for the actual cost of its reproduction. Copies of the Draft EIR should <br />also be furnished to appropriate public library systems. <br />The City is encouraged to make copies of filed notices available in electronic format on <br />the Internet. Such electronic postings are in addition to the procedures required by the CEQA <br />Guidelines and the Public Resources Code. <br />7.26 SUBMISSION OF DRAFT EIR TO STATE CLEARINGHOUSE. <br />A Draft EIR must be submitted to the State Clearinghouse for review by state agencies in <br />the following situations: <br />(a) A state agency is the Lead Agency for the Draft EIR; <br />(b) A state agency is a Responsible Agency, Trustee Agency, or otherwise has jurisdiction by <br />law over resources potentially affected by the project; or <br />(c) The Draft EIR is for a project identified in State CEQA Guidelines Section 15206 as being <br />a project of statewide, regional, or area-wide significance. <br />State CEQA Guidelines Section 15206 identifies the following types of projects as being <br />examples of projects of statewide, regional, or area-wide significance that require submission to <br />the State Clearinghouse for circulation: <br />(1) General plans, elements, or amendments for which an EIR was prepared; <br />(2) Projects that have the potential for causing significant environmental effects <br />beyond the city or county where the project would be located, such as: <br />(a) Residential development of more than 500 units; <br />(b) Commercial projects employing more than 1,000 persons or covering more <br />than 500,000 square feet of floor space; <br />(c) Office building projects employing more than 1,000 persons or covering <br />more than 250,000 square feet of floor space; <br />(d) Hotel or motel development of more than 500 rooms; and <br />(e) Industrial projects housing more than 1,000 persons, occupying more than <br />40 acres of land, or covering more than 650,000 square feet of floor area; <br />3 -119
The URL can be used to link to this page
Your browser does not support the video tag.