My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20D - AA - WATERSMART GRANT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
20D - AA - WATERSMART GRANT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:47:26 PM
Creation date
9/27/2019 4:09:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20D
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 52 <br />oversight, and acceptance. If applicable, the Recipient shall also coordinate and obtain approvals <br />from site owners and operators. <br />6.1.2 Interim Performance Reports. The Recipient shall prepare and submit to Reclamation <br />interim Project performance reports (Interim Performance Reports) as required by Section 1.9 of <br />this Agreement. Each Interim Performance Report will include (but is not limited to) the <br />information identified in paragraph I.9.3 and will discuss the following: <br />• A comparison of actual accomplishments to the milestones established by the financial <br />assistance agreement for the reporting period <br />• The reasons why established milestones were not met, if applicable <br />• The status of milestones from the previous reporting period that were not met, if <br />applicable <br />• Whether the Project is on schedule and within the original cost estimate <br />• Any additional pertinent information or issues related to the status of the Project <br />6.1.3 Final Project Report. The Recipient shall prepare and submit to Reclamation a final <br />Project performance report (Final Project Report) as required by Section I.9 of this Agreement. <br />The Final Project Report will include (but is not limited to) the information identified in <br />paragraph 1.9.3 and will discuss the following: <br />• Whether the Project objectives and goals were met <br />• Discussion of the benefits achieved by the Project, including information and/or <br />calculations supporting the benefits <br />• How the Project improves long-term resiliency to drought <br />• How the Project demonstrates collaboration, if applicable <br />Photographs documenting the project are also appreciated. Recipient understands that <br />Reclamation may print photos with appropriate credit to Recipient. Recipient also understands <br />that the Final Project Report is a public document and may be made available on Reclamation's <br />website, www.usbr.gov/drought. <br />6.1.4 Post -award cost documentation. During pre -award clarifications, there was insufficient <br />documentation to support the construction contract cost estimate. Therefore, prior to any request <br />for drawdown of Reclamation funding, Recipient shall provide sufficient support for the <br />allowability, allocability, and reasonableness of costs for the estimated construction contract cost <br />line -item in the budget. Sufficient support can be in the form of source documentation that <br />supports the full estimated contract cost (such as quotes, market research, etc.) or actual, final <br />competitive bid documents to include proposal/quote requests, bid tabulations, and selection <br />documentation. Grants Officer approval of the construction contract costs will be documented by <br />formal modification to the Agreement. <br />Agreement No. R18AP00081 Agreement Template <br />2 0 D -1 2 (03/2019) <br />
The URL can be used to link to this page
Your browser does not support the video tag.