My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - PAVEMENT MGNT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
25D - AGMT - PAVEMENT MGNT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:49:50 PM
Creation date
9/27/2019 4:09:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Pavement Management Program Update RFP No. 19-070 <br />August 6, 2019 <br />Services provided: NCE updated the City of Anaheim's PAVERTM <br />PMP in compliance with OCTA's Measure M requirements in 2014, <br />2017 and recently submitted the 2019 OCTA PMP Update. The <br />current contract with the City extends to 2021 and includes the <br />conversion from PAVERT19 to StreetSaver® PMP software. The street <br />network consists of approximately 584 centerline miles of pavement <br />including 155 miles of Arterial Highway System (AHS) and 429 <br />centerline miles of Local Street System (LSS). <br />NCE's scope of work included the following tasks: <br />E Update PAVER to the most current version <br />#0 2018 convert PAVER PMP database to StreetSaver <br />00 Verify all street dimensions <br />00 Performing distress/condition surveys as per the most current <br />version of ASTM D6433 <br />4: Performing distress/condition surveys as per the most current <br />version ofASTM D6433 <br />4! <br />4". <br />PO <br />44 <br />fit <br />4! <br />0 <br />Collecting both ride quality (International Roughness Index) <br />and digital images of the pavements <br />Identify missing sidewalk gaps <br />Implementing a rigorous QC plan for data control and delivery <br />Client Contact <br />City of Anaheim <br />Cesar Carrillo <br />Principal Civil Engineer <br />(714) 765-5175 <br />ccarrillo@anaheim.net <br />Project Team <br />Lisa K. Senn <br />Senior Project Manager <br />Charlene Palmer <br />Principal -in -Charge <br />James Signore, PE <br />QC Manager <br />Narut Leehachroenkul, PE <br />Project Engineer <br />Updating the M&R history since 2015 <br />Creating shapefiles and KML files with the pavement condition information. <br />Performing funding scenarios <br />Perform Budget Scenarios per OCTA guidelines (these are different from preceding scenarios and <br />are required) <br />Prepare all reports and submittals to <br />Page 114 <br />25D-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.