My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - PAVEMENT MGNT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
25D - AGMT - PAVEMENT MGNT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:49:50 PM
Creation date
9/27/2019 4:09:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Pavement Management Program Update RFP No, 19-070 <br />August 6, 2019 <br />Narut Leeliacharoenkul, PE — Project Engineer <br />Mr. Narut Leehacharoenkul has always been fascinated with how things are built and how <br />systems operate. Inspired by the design and construction aspect of civil engineering, he enjoys <br />making a positive impact on local communities, while "collaborating with and learning from all <br />the great people within NCE." Valued by clients for his responsiveness, Narut is experienced in <br />pavement condition, CA/QC and multiple software programs for pavement management <br />budget analyses and asset management. In addition, he has been involved with developing <br />transportation asset inventories using digital imagery from Earthmine and populating geodata-: <br />bases with ArcMap and ArcGIS Online. He is heavily involved with pavement management <br />Education <br />projects, as well as with the asset data collection for the Cities of Burbank, Carson, Commerce, <br />Civil Engineering <br />Corona, Diamond Bar, Lake Forest, Redondo Beach, San Gabriel, Santa Monica, Thousand <br />(Tr <br />(Transportation System <br />Engineering), 2012; University <br />Oaks, Torrance, and West Covina, as well as Orange County. <br />of California —Irvine <br />Representative Projects <br />- <br />Licenses/Certifications <br />Pavement Management System Update and Integration, City of Santa Monica, CA. Project <br />Professional Engineer -Civil, <br />Engineer. Narut assisted in QC for the pavement distress data collection and performed the <br />CA, ii87320 <br />PCI calculations for the City's entire pavement network that included 71.4 centerline miles of <br />OCTA Pavement Inspector <br />arterials, 13.5 centerline miles of collectors, and 79.4 centerline miles of residentials/others. <br />Prequalification <br />NCE assisted the City in selecting and implementing PMS software. <br />MTC StreetSaver® Rater <br />Certification Program <br />Pavement Management Program Update, City of Burbank, CA. Project Engineer. Narut <br />assisted in QC for the pavement distress data collection and performed the PCI calculations for <br />Affiliations <br />the City's pavement network. The scope of work included database transition from PAVER'"' <br />American Society of Civil <br />to StreetSaver®, pavement condition surveys, quality control plan, maintenance and <br />Engineers <br />rehabilitation strategies, and budgetary analyses. <br />Pavement Management Program Update and Asset Management, City of Redondo Beach, <br />veers of Experience <br />5 years <br />CA. Project Engineer. NCE updated the City of Redondo Beach's pavement management plan. <br />The street network consists of approximately 126 centerline miles of paved streets. NCE <br />performed a software evaluation and converted the RoadMatrix database to StreetSaver®; performed distress/condition <br />surveys per the most current version of ASTM D6433; updated the maintenance and rehabilitation <br />history since 2015; <br />performed funding scenarios; quality control; prepared a pavement condition index report and submittals for the Los Angeles <br />County Metropolitan Transportation Authority; and is performing asset data collection,. including conducting a curbramp, <br />sidewalk, and sign inventory. <br />Multiple PMS Updates and Implementations, Various Cities and Counties, CA. Project Engineer. <br />Narut is responsible for <br />updating the analysis and quality control of pavement distress data, updating maintenance and rehabilitation decision trees <br />and the treatment unit costs, and the development of budget scenarios and summary reports. His <br />clients include the following <br />cities and counties: <br />41 Anaheim 0 Diamond Bar 0. Mission Viejo 41 <br />Santa Barbara County <br />41 Berkeley 4; El Centro 0 Newport Beach 41 <br />Santa Clarita <br />41 Buena Park 4' Fresno COG 41 Orange (City) 41 <br />Santa Monica <br />14 Burbank Highland 44 Orange County <br />Seal Beach <br />41 Camarillo 0 La Habra 41 San Clemente 40 <br />Stanton <br />0 Carson 41 Laguna Niguel 0 San Diego County V <br />Thousand Oaks <br />44 Commerce R Lake Forest 0 San Gabriel 40 <br />Torrance <br />- 41 Corona 41 Manhattan Beach 0 San Marino V <br />West Covina <br />0 Dana Point <br />°AN Page IA-S <br />25D-49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.