Laserfiche WebLink
1, TIER Mark M. Butier, Jr. <br />tarufrrr�alon Aiynenpr3. Cq�13u/nn{(enylnamfa <br />Project Director <br />Owner's Representative, Agua Hadionda Sewer Lift Station and <br />Vista/Carlsbad Interceptor Sewer Replacement; Vista, CA; Cities of <br />Vista and Carlsbad (Completion: 2018; Value $64.2 million) —Butler is <br />performing as the Owner's Representative for the construction of the sewer <br />lift station and interceptor sewer reaches. The project begins at the north <br />shore of the Agua Nedionda Lagoon In Carlsbad and extends a distance of <br />2.3 miles to the Encina Water Pollution Control Facility. Major project <br />components include the following; 1) Removal and replacement of the <br />existing wood trestle sewer support bridge across the lagoon with a new steel <br />support bridge. The existing 42-inch diameter sewer pipe along the bridge will <br />be replaced with a new 54-Inch pipe; 2) Removal and replacement of the <br />existing Agua Hedionda lift station. The new structure will house replacement <br />motors and pumps, as well as new system enhancements including an <br />emergency generator and bypass motors and pumps, an electrical control <br />building, and odor control facilities; and 3) Construction of a new 30-Inch <br />diameterforce main and a new 54-inch diameter gravity sewer line to <br />Increase system capacity and reliability. The force main will provide 4,000 <br />linear feet of high density polyethylene pipe parallel to an existing line and will <br />connect into 7,000 linear feet of new 54-inch diameter gravity sewer to be <br />constructed in Avenida Encinas from Cannon Road to the Encina Water <br />Pollution Control Facility. <br />Project Director, Orange County Groundwater Storage Program; Orange <br />County, CA (Orange County Water District) --The Orange County <br />Groundwater Storage Program consisted of equipping eight (8) municipal <br />water production wells in the cities of Santa Ana, Anaheim, Garden <br />Grove, Westminster, Cypress, Placentia, and Buena Park. The scope of work <br />for the wells Included site work; Installation of deep well turbine pump and <br />motors, electrical and instrumentation work, disinfection facilities, discharge <br />piping and valving, and off-slte piping and vaiving; construction of concrete <br />block buildings, paving, drainage, fencing, and landscaping; and startup, <br />testing, and training. Mr. White coordinated with building officials, City <br />engineers, and public works departments to learn the organization's - <br />operation, discover the hierarchy, and present solutions tailored to each of <br />the agency's needs. <br />Project Director, Burris Pump Station Project —Phase 2; Anaheim, CA; <br />Orange County Water District (Completion: 2016; Value, $20,585,400)— <br />Mr. Butler oversaw the construction management and inspection services <br />team for the Burris Pump Station Project — Phase 2, Phase 1 included the <br />construction of a portion of the building site and an earthen berm. The berm <br />allows the basin to remain in operation during final construction of the wet <br />well and pump station. Phase 2 consisted of the construction of a new 10,000 <br />SF storm water pump station that uses four conventional vertical turbine <br />pumps installed in a circular wet well. The pump station also consists of new <br />mechanical, electrical, and control systems. An Intake pipe was installed on <br />the slope of the embankment, connecting the new pumps to the intake invert. <br />