1RUTIER
<br />C.n.M, wMl .gm, tens klq knpnosrs
<br />Kyle Morghelm, P.E.
<br />Project Manager
<br />Resident Engineer, Millikon 1010 Zone Pump Station; Chino, CA; Chino
<br />Basin Desalter Authority (Completion: 2014; Value: $1.3 million) —The
<br />scope of work includes the following potable water Improvements: construction
<br />of a ventilated CMU Pump Station,198 LF of 16-Inch discharge piping and
<br />interconnection to an existing 30-inch transmission line, and 24-inch suction
<br />piping and interconnection to an existing 24-inch transmission line; installation of
<br />3 vertical turbine pumps and associated piping, fittings, valves, appurtenances,
<br />electrical instrumentation, and controls; and site improvements, including grading
<br />and paving and restoration of existing improvements.
<br />Technical Advisor, Moffett Drive and Park Avenue Roadway Extension
<br />Project; City of Tustin, Public Works (Completion: 2016; Value: $14.5
<br />million) —Mr. Morgheim provided construction management services for the
<br />Moffett Drive and Park Avenue Extension Roadway Project. The project included
<br />the removal and compaction of 250,000 CY of removal and compaction of soil;
<br />275,000 SF of subgrade preparation and street fine grading; and 4,000 LF of
<br />reinforced concrete box storm drain. The project also includes the construction of
<br />street improvements, paving, utility installation, signing, traffic installation,
<br />landscaping, and irrigation. Approximately 15,000 CY of concrete was used to
<br />construct the reinforced concrete box storm drain, which includes lateral storm
<br />drains with catch basins. Major dewatering efforts and shoring under the
<br />Jamboree Bridge at Moffett Drive presented significant challenges that Butler
<br />coordinated with success,
<br />Technical Advisor, Peter's Canyon Channel and Moffett Drive Bridge
<br />Construction and Street improvements Project; City of Tustin, Public
<br />Works (Estimated Completion: 2018)—Mr. Morgheim is providing
<br />construction management services for the Peter's Canyon Channel and
<br />Moffett Drive Bridge Construction and Street Improvements Project. The
<br />scope of work consists of removing the existing bridge and constructing a
<br />single span cast -in -place concrete box girder bridge approximately 108 feet in
<br />length and 73.25 feet In width. The work also includes an architectural steel
<br />arch on each side of the bridge. In addition to the construction of bridge, the
<br />work shall include, but not limited to construction of barriers, sidewalks, wing -
<br />walls, foundation, railings, structure excavation, backfill, drainage, and bridge
<br />lighting. The channel work includes demolition, widening, and relining
<br />approximately 5,000 feet of the existing channel within the Cities of Tustin
<br />and Irvine. The channel scope of work also includes construction of new
<br />storm drain lines, extension of existing storm drain lines, and road
<br />undercrossings.
<br />Technical Support, Armstrong Avenue & Warner Avenue Extension
<br />Phase 2 Street Improvements, City of Tustin (Completion 2015; Value
<br />$13.2 million) --Mr. Morgheim provided technical support services for the
<br />Armstrong/Wamer Ave. Extension Phase 2 project. The scope of work
<br />included roadway Improvements, traffic signals, landscape, dry utility,
<br />waterline, and reclaimed water and sewer line construction on the following
<br />streets: Armstrong Avenue Extension from Warner Avenue to Barranca
<br />Parkway and Warner Avenue Extension from Red Hill Avenue to Tustin
<br />Ranch Road.
<br />
|