1IJTIER
<br />dunsUastioa Manipms, Gantalthp knglnoarR
<br />EDUCATION
<br />M.S., Construotlon
<br />Management, University of
<br />Southern California, Los
<br />Angeles, California, 2003
<br />B.S., Civil Engineering,
<br />California State Polytechnic
<br />University - Pomona,
<br />California, 1.995
<br />LICENSES /
<br />CERTIFICATIONS
<br />Professional Civil Engineer:
<br />California (CE59405)
<br />AFFILIATIONS
<br />Project Management Institute
<br />Building Industry Association,
<br />Orange County Chapter
<br />Urban Land Institute
<br />YEARS WITH FIRM
<br />3 years
<br />AVAILABILITY
<br />As-Noeded
<br />Vladimir Burce, P.E.
<br />Technical Advisor
<br />Professional Summary
<br />Mr. Burce is a registered civil engineer with over 23 years of professional
<br />experience in project and construction management, including planning,
<br />design, resource allocation, and cost/schedule management of major projects.
<br />He has extensive experience in providing PM and CM services for
<br />water/wastewater treatment facilities, wells, pump stations, storm water
<br />detention I retention systems, transportation, parking structures, industrial,
<br />educational, residential, and land development projects during the design and
<br />construction phases.
<br />Mr. Burce has diverse project experience in public works and real estate
<br />development. This background provides him with an In-depth understanding
<br />of civil engineering disciplines. His professional responsibilities have ranged
<br />from feasibility study, geotechnieai, civil design, complex drainage design and
<br />regulatory requirements, technical specifications development and preparation
<br />of bid documents, design/construotability review, schedule preparation, field
<br />Implementation and supervision, and construction management.
<br />Relevant Experience
<br />Resident Engineer, Mid -Basin Injection: Centennial Park Project; Santa
<br />Ana, CA; Orange County Water District (Completion: 2018; Value: $23.2
<br />million) —The Mid -Basin Injection project consists of the construction of the
<br />following: four groundwater injection wells in below grade vaults; a monitoring
<br />well at the Heritage Museum site; a purified recycled water injection supply
<br />pipeline approximately 5,000 feet long that connects to the District's existing
<br />Groundwater Replenishment System (GWRS) pipeline and crosses the Santa
<br />Ana River; a backflush discharge pipeline approximately 4,000 feet long that
<br />discharges to the Greenville -Banning Channel and Centennial Park Lake;
<br />installation of submersible pumps within the four injection wells; replacement
<br />of approximately 9.6 acres of paving within the Park; demolishing an existing
<br />City of Santa Ana restroom facility; and constructing two new buildings with
<br />Shared City and District uses. Mr. Burce is coordinating closely with the City
<br />of Santa Ana, Santa Ana Unified School District, Heritage Museum, and state
<br />and federal agencies.
<br />Resident Engineer, Chino II Well Field Equipping of Raw Water Wells
<br />Nos. I1-10 and 11.11; Eastvale and Ontario, CA; (Chino Basin Desalter
<br />Authority (Completion: 2017; Value: $3.8 million) —Mr. Burce provided
<br />resident engineering services for Well Nos. II-10 and II-11. Well II-10 is
<br />located on CDA property in the City of Eastvale within Riverside County, Well
<br />II-11 (Lot "A") is located on CDA property in the City of Ontario within San
<br />Bernardino County. The scope of work included equipping of two water wells
<br />Including, but not limited to, the following: construction of 16'8" W x 41'4"L x
<br />16"H reinforced masonry block building; installation of 3,300 gpm vertical
<br />turbine stainless steel pumping unit and 600 hp premium efficiency motor,
<br />16-Inch diameter epoxy lined steel discharge header pipe, 12-Inch diameter
<br />PUMP to waste piping, 16-inch diameter flow meter, site pressure piping and
<br />tubing, valves, taps and Corp stops, pressure gages, 16-Inch diameter C905
<br />PVC underground discharge pipeline, and connection to existing 24-inch
<br />
|