BUTIER ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUTIER ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 5:23:36 PM
Creation date
10/23/2019 5:19:58 PM
Metadata
Fields
Template:
Contracts
Company Name
BUTIER ENGINEERING, INC.
Contract #
A-2019-171
Agency
PUBLIC WORKS
Council Approval Date
10/1/2019
Expiration Date
9/30/2022
Insurance Exp Date
6/25/2020
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HUTIER <br />C"S"Ittm Wwlwt s, Cnnpulting,Enylwnrn <br />Vladimir Burce, P.E. <br />Technical Advisor <br />diameter discharge pipeline; and on- and off -site electrical, including power, <br />control, lighting, underground electrical duct, instrumentation equipment and <br />panels, switchgear, VFD and motor control center equipment, and installation <br />of SCADA equipment, The project Included close coordination with the City of <br />Ontario, City of Eastvale, County of San Bernardino County Flood Control <br />District, Southern California Edison, and local businesses and residents, <br />Resident Engineer, Chino Desalter Reliability Project; Chino, CA; Chino <br />Basin Desalter Authority (Completion: October 2017; Value: $3.8 <br />million) —Butler provided CM and Inspection services for the Chino I Reliability <br />Project located at the existing Chino I Desalter. The project scope included the <br />following: new building built on to the existing Chino I Desalter facility; new RO <br />train tied Into the existing feed water, permeate, concentrate, and CIP piping <br />manifolds; modification of the existing sulfuric acid chemical system by <br />replacing two existing metering pumps and furnishing and installing two <br />metering pumps; trench overflow constructed and connected below the air gap <br />that conveys water to the brine line; slurry seal all existing and new asphalt <br />surfaces; coating of the exterior of the existing process building to match the <br />new process building exterior coating system; and coating of all existing <br />trenches, <br />Construction Manager, Chino II Desalter Concentrate Reduction <br />Facility; Jurupa Valley, CA; Chino Basin Desalter Authority <br />(Completion, 2016—Value: $46.6 million) —Butler provided CM and <br />inspection services for the CRF groundwater treatment facility. Both Ion <br />exchange (IX) and RO treatment trains are used to treat brackish <br />groundwater from eight wells that also have elevated nitrate concentrations. <br />The project scope Included construction of new softening, clarification, <br />filtration, and secondary RO (SRO) treatment and solids dewatering and <br />storage; installation of a new decarbonator; installation of a new transfer <br />pump with motor with associated VFD and motor controls and discharge <br />piping and valves; installation of new cartridge filters; modification of the <br />existing sulfuric acid chemical system; modification of the existing threshold <br />inhibitor chemical system; and site modifications, Including fencing and gates, <br />yard piping, and storm drain replacement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.