My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUTIER ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUTIER ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 5:23:36 PM
Creation date
10/23/2019 5:19:58 PM
Metadata
Fields
Template:
Contracts
Company Name
BUTIER ENGINEERING, INC.
Contract #
A-2019-171
Agency
PUBLIC WORKS
Council Approval Date
10/1/2019
Expiration Date
9/30/2022
Insurance Exp Date
6/25/2020
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11BUTI ER <br />cwsl ..00" MON04,s, co salaho G"Qlna , <br />EDUCATION <br />Construction Apprenticeship, <br />Rio Hondo College; Whittier, <br />CA,1981 <br />Construction Management, <br />Pasadena College; <br />Pasadena, CA,1978 <br />LICENSES / <br />CERTIFICATIONS <br />ICC Reinforced Concrete <br />Special Inspector <br />No.5057063 <br />Exp, 0113112019 <br />American Concrete Institute <br />Field Testing Technician - <br />Grade I Certification <br />Exp. 11/1512019 <br />YEARS WITH FIRM <br />1s years <br />AVAILABILITY <br />100% <br />Bart Crawford <br />Lead /nspeator <br />Professional Summary <br />Mr. Bart Crawford came to Butler from the Metropolitan Water District, Los <br />Angeles, where he spent over five years as an Inspector. His heavy <br />construction experience and knowledge of methods and equipment have <br />facilitated an expertise In concrete and steel structures, various types of form <br />work, bridge construction, controlled blasting, pre -stress, earth wort, roadway <br />improvements, rock bolting, reinforcing steel, tunneling, metal decking, <br />architectural/interior finish. As an inspector for Butler, Mr. Crawford works <br />primarily on water capital improvement projects, Including water and <br />wastewater treatment plants, pipelines, pump stations, and reservoirs. His <br />inspection duties typically Include utility/agency coordination, submittals, RFI <br />and field memo responses, interpretation of drawings and general <br />correspondence with design engineer. His background includes 18 years of <br />union Carpentry. <br />Mr. Crawford provides both pipeline encasement construction and pipeline <br />inspection experience to water projects. Pipeline work has involved piping for <br />filtration plants, domestic water lines and reservoirs. Pipe material has <br />Included CML&C and ductile iron. Experience has also included flow measure <br />and flow metering for 144" and 66" lines, and tunneling. <br />Project (Experience <br />Lead Inspector, Groundwater Reliability Improvement Project (GRIP) <br />Advanced Water Treatment Facility Project; Water Replenishment <br />District of Southern California (Value: $100 million) —Mr, Crawford Is <br />providing field Inspection services as a part of GHD's Owner's Agent/Owner's <br />Engineer team for the GRIP Advanced Water Treatment Facility Project. As a <br />part of the GRIP Program, an advanced water treatment facility is being <br />constructed to purify 10,000 acre feet (3.25 billion gallons) of tertiary treated <br />(recycled) water annually. The GRIP AWTF is being built on a 6.2 acre <br />property in the City of Pico Rivera, adjacent to the San Gabriel River. The <br />GRIP AWTF will include the following treatment processes: automatic <br />strainer; microfiltration (MF) and reverse osmosis (RO) followed by ultraviolet <br />advanced oxidation (UVAO); cartridge filtration; decarbonation; and pH <br />adjustment/corrosivity stabilization. <br />Lead Inspector, Chino Creek Wall Field Equipping -Wells 1-16, 1-17, and I- <br />18; Chino, CA; Chino Basin Desalter Authority (Completion: 2013; <br />Value: $1.6 million) —Provided inspection services for the Equipping of <br />Chino Creek Well Field Wells 1-16, 1-17 & 1-18 project. The groundwater wells <br />were equipped as part of the CDA Phase 3 Expansion Project. In addition to <br />well equipping, the project included the installation of 626 LF of 8" diameter <br />HDPE corrugated storm drain pipe and the grading and paving of the well <br />sites. Coordination with other projects was required, Including connection of <br />well discharge lines to the Chino Creek Well Field Raw Water Pipeline. The <br />project also involved coordination with the City of Chine to secure the <br />required permits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.