Laserfiche WebLink
These sections define requirements and <br />procedures for checking, reviewing, distributing, <br />tracking, and controlling documents for QAlQC. <br />The project specific QA/QC Plan will be <br />submitted and reviewed by the City prior to <br />submittal of other project deliverables. The <br />Individuals performing QA/QC reviews will be <br />clearly Indicated In the project organization <br />chart. Deliverables will contain a statement that <br />the information contained In the submittal has <br />been quality control checked in accordance with <br />the QA/QC Plan. <br />Quality Assurance is the confirmation <br />process that all procedures directing the work <br />have been developed and followed and any <br />corrective actions required have been <br />implemented. Procedures or actions to be <br />confirmed include: <br />• Construction management plan; <br />• Training of staff in QA/QC requirements; <br />• Submittal process plan; <br />• Document control plan; <br />• Identification of City approvals at <br />appropriate milestones; <br />• Control of testing to determine validity and <br />accuracy of data collected in the field; <br />• Calibration and testing of equipment; <br />• Identification of the need for corrective <br />action; and <br />• Audit to verify compliance with the QA/QC <br />Plan. <br />Quality Control is the actual checking and <br />validation of the inputs and outputs of the <br />work. Activities to be verified for the work <br />include the following: <br />• Review by quality control team; <br />+ Identification and compliance with <br />applicable codes, ordinances, permits, <br />environmental requirements, etc.; <br />• Review input data and check calculations; <br />City of Santa Ana, Public Works Agency <br />Construction Engineering Services for the <br />San Lorenzo Sewage Lift Station, RFP No, 18.049 <br />• Review drawings, specifications, technical <br />reports, memos, meeting minutes; <br />• Perform constructability, operability, <br />maintainability, and usability reviews; and <br />• Review design for compliance with safety <br />standards. <br />tati Management" <br />The Principal -In -Charge and Project Manager <br />will prepare a specific CM Communications <br />Manual for the San Lorenzo Sewage Lift <br />Station Project to be approved by the City. <br />The manual will include project <br />correspondence and other forms of <br />communication In accordance with the City's <br />document formatting standards. The manual <br />will Integrate the interdependent roles of the <br />City, Construction Manager, Design Engineer, <br />and the Contractor, through pre -construction, <br />mobilization, construction, and acceptance of <br />the phases of the work. The Communication <br />Manual will include the following: <br />• Project organization: Individual <br />assignments, responsibilities, phone <br />numbers, lines of communication, and <br />methods for Interfacing with the City, <br />project stakeholders, and the Contractor, <br />Organization chart showing relationships <br />between the parties. <br />• Project Control; Description of cost, <br />schedule and document control systems. <br />• Communication Management: <br />Procedures for documenting <br />communications and correspondence; <br />distribution and/or routing lists; and <br />examples of all forms that the Contractor <br />will be required to use. <br />• Mooting/Notice Procedures: <br />Schedules, notices, agendas, reporting <br />procedures, documentation requirements, <br />and timely acceptance processes. <br />• QAiQC: Procedures, laboratory testing, <br />field-testing, coordination checks, and <br />C. unfaEusrANDintG OF -NEED <br />