My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUTIER ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUTIER ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 5:23:36 PM
Creation date
10/23/2019 5:19:58 PM
Metadata
Fields
Template:
Contracts
Company Name
BUTIER ENGINEERING, INC.
Contract #
A-2019-171
Agency
PUBLIC WORKS
Council Approval Date
10/1/2019
Expiration Date
9/30/2022
Insurance Exp Date
6/25/2020
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction inspection activities for all <br />project features, equipment and materials. <br />• Document Control Discussion of <br />Butter's cloud -based project management <br />document control system used to input <br />and track various reports and <br />correspondence between key parties. <br />• Contract Administration: Description of <br />control systems and procedures for <br />performing and <br />documenting <br />submittal reviews, <br />RFIs, change <br />orders, claims <br />management, <br />contract closeout <br />activities, and <br />other contract <br />administration <br />procedures. <br />• Records: The <br />CM will maintain <br />records of <br />inspections, <br />reports, and test <br />results received <br />from the <br />Contractor, <br />Design Engineer, <br />manufacturers, <br />and others. <br />a.M. OMM <br />The Butler Team recommends utilizing <br />Procore—a cloud -based construction <br />project management solution. --to organize, <br />manage and control project documentation. <br />The advantages of Procore include unlimited <br />users and storage, 24/7 visibility Into project <br />status, and a centralized, comprehensive <br />platform to manage vital project data. All <br />parties involved have access to the system. <br />Each user can access the program via a <br />web browser on their computer or mobile <br />device using secure log -in Information, <br />Procore is utilized to store, review, track, and <br />manage all project documents including <br />City of Santa Ana, Public Works Agency <br />Oonstruction Engineering Services for the <br />San I Men= SOW098 Lift Station, RPP Na 18-049 <br />construction drawings and specifications, <br />RFIs, submittals, transmittals, meeting <br />agendas and minutes, emails and <br />correspondence, progress photos, budgets, <br />schedule of values, payment applications, <br />change orders, daily inspection reports, final <br />punch lists, and point of contact information. <br />Additionally, Procors can be configured to <br />display the latest Primavera P6 <br />construction <br />project schedule <br />and weather <br />Information, both <br />current and forecast. <br />Automated smalls <br />can be generated by <br />the software program <br />to remind personnel <br />of required <br />documentation <br />reviews and other <br />project related tasks <br />that need attention, <br />Project <br />documentation is <br />continuously updated <br />and available always <br />to all involved <br />personnel, with prior <br />revisions stored for <br />reference. At the conclusion of the project, <br />project -related documentation is converted to <br />PDF format and distributed to the appropriate <br />parties. <br />SPECIAL CONCERNS i SUGGESTIONS <br />Butler has vetted special concerns that the <br />City should be made aware of, Table 1, <br />located on the following pages, provides a <br />summary of these concerns and suggestions. <br />1lalli� C. UNDERSTANDING QFNEE®_ <br />m , _. <br />
The URL can be used to link to this page
Your browser does not support the video tag.