My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUTIER ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUTIER ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 5:23:36 PM
Creation date
10/23/2019 5:19:58 PM
Metadata
Fields
Template:
Contracts
Company Name
BUTIER ENGINEERING, INC.
Contract #
A-2019-171
Agency
PUBLIC WORKS
Council Approval Date
10/1/2019
Expiration Date
9/30/2022
Insurance Exp Date
6/25/2020
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1, Special Concerns / Suggestions <br />� nl� <br />Schedule Control <br />Objective: Implement <br />proposed project according to <br />Its schedule and any <br />constraints. <br />Quality Control <br />Objective: Follow QC <br />guidelines to minimize rework <br />that could result in schedule <br />delays. <br />Cost Control <br />Objective: Utilize and follow <br />cost control management <br />strategies to keep project <br />within budget. <br />Stakeholder Coordination <br />Objective: Be responsive to <br />pro act stakeholder <br />coordlnation requirements to <br />achieve a high confidence level <br />for project success. <br />Team Cohesiveness <br />Objective: Maintain a <br />streamlined, team that works <br />well together during CM and <br />inspection activities. <br />Constructability <br />Objective: Engage an <br />experienced CM team to <br />perform constructability <br />reviews at critical design <br />milestones. <br />City of Santa Ana, Public Works Agency <br />Construction Engineering Services rt r the <br />San Lorenzo Sewage Lift Station, RFP No. 18.049 <br />❑ Review Program Schedule during <br />pre -construction phase <br />❑ Conduct Schedule Workshops <br />regarding project constraints with <br />stakeholders <br />❑ Follow proven Butler QA/QC plan <br />with experienced inspection staff. <br />❑ Document work activities and <br />distribute to CM members daily. <br />❑ Ensure contractor redlines are up <br />to date on a weekly basis. <br />❑ Provide CM/Field Engineering <br />budget linked to resource -loaded <br />construction baseline schedule. <br />❑ Quantify and negotiate PCOs to <br />ensure contingent costs are <br />reported to management. <br />❑ Provide proactive alternatives to <br />construction sequencing. <br />❑ Utilize document control tools for <br />team 24/7 team access. <br />❑ Partiolpate in any partnering <br />workshops proposed by City. <br />❑ Hold issue specific team meetings <br />/workshops. <br />❑ Provide a locally -based team that <br />has worked well together on <br />similar projects. <br />❑ Build from recent CM and <br />inspection activities for other <br />similar projects. <br />❑ Provide local team that is familiar <br />with local Issues and contractors. <br />❑ Provide an Independent team to <br />perform reviews. <br />❑ Provide input and respect <br />Engineer's design approach. <br />❑ Confirm project sequencing <br />requirements are addressed in <br />Contract Documents. <br />❑ Confirm proper interface between <br />construction projects. <br />❑ Identification of key schedule <br />constraints early on to mitigate <br />potential delays. <br />❑ Minimized cost overruns due to <br />unforeseen construction issues. <br />❑ Meet schedule with fully - <br />functional facility <br />❑ Concise 2-week look -ahead. <br />❑ Streamlined sequencing & <br />coordination <br />❑ Minimize inspection costs <br />❑ Provide City staff with current <br />summarized data weekly. Create <br />Management "dashboard" for <br />interface with field CM team. <br />❑ Maintain a "no surprises" result <br />when planning progress <br />payments or approval of PCOs. <br />❑ Provide a monthly report detailing <br />progress & delineate project risk. <br />❑ Facilitated, yet secure, document <br />filing system for detailed project <br />progress. <br />❑ Streamlined communications and <br />accountability for project success. <br />❑ Established plan for maintaining <br />Stakeholder Involvement.. <br />❑ Adaptive CM and inspection team <br />that Is in close proximity to project <br />site <br />❑ Proven integration of our <br />combined Team's CM and <br />Inspection expertise, <br />❑ Team with knowledge of current <br />bidding climate. <br />❑ Confidence in oonstructability <br />reviews to identify ambiguities <br />and conflicts. <br />❑ Lower bid prices, reduced change <br />orders/claims and fewer delays. <br />❑ Mitigate/ellminste Impact to <br />stakeholders on concurrent <br />construction activities. <br />UTl R,,,. _ C. UNDERSTANDING OF NEED <br />