My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ROCKFORCE CONSTRUCTION, LLC
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ROCKFORCE CONSTRUCTION, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 12:53:26 PM
Creation date
10/29/2019 3:20:21 PM
Metadata
Fields
Template:
Contracts
Company Name
ROCKFORCE CONSTRUCTION, LLC
Contract #
P 06-3510
Agency
Public Works
Council Approval Date
10/1/2019
Document Relationships
23A - PROJ - BRISTOL ST REHAB
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\10/01/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 06-3510 <br />SAN LORENZO SEWAGE LIFT STATION <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Rockforce Construction,;LLC <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1* <br />Mobilization/Demobilization <br />1 <br />LS <br />$- <br />$ <br />2 - <br />Sheeting, Shoring, Bracing and <br />- 1 <br />LS <br />$ - <br />$ <br />Excavationtrrench Protection <br />3 <br />Construct, Operate and Maintain a <br />I <br />LS <br />$ <br />$ <br />Dewatering System <br />4 <br />ConstructSewageLift Station <br />1 <br />LS - <br />-$ <br />$- <br />5 <br />Furnish and Install Electrical Equipment <br />1 <br />LS <br />S <br />$ <br />and Facilities <br />6 <br />Furnish and Install Instrumentation and <br />I <br />LS <br />$ <br />$ <br />Control Equipment and Facilities including <br />Programming <br />7 <br />Construct Site Piping <br />I <br />LS <br />$ <br />$ <br />8 <br />Construct Site Improvements <br />-- 1 <br />- LS <br />$ <br />$ <br />-9 <br />Construct Temporary Sewer Bypass of <br />1 <br />LS <br />$ <br />$ <br />Existing 10" Sewer at Lift Station Site <br />10 <br />Construct Electrical Conduit from Existing <br />I <br />LS <br />$ <br />$ <br />Generator by Directional Drilling <br />l l <br />Demolition of Existing Segerstrom Lift <br />I <br />LS <br />$ <br />$ - <br />Station <br />12 <br />Construct Parallel Force Mains and Valves, <br />1 - <br />LS <br />$ <br />$ <br />and 15" Gravity Sewer and Manholes from <br />Sm. 7+87t to Sta. 15+49t <br />13 <br />Construct 15" Gravity Sewer and <br />I <br />LS <br />$ <br />$ <br />1 <br />Manholes from Sta. 20+00 to Sta. 25+72t <br />P-1 ofP-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.