My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ROCKFORCE CONSTRUCTION, LLC
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ROCKFORCE CONSTRUCTION, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 12:53:26 PM
Creation date
10/29/2019 3:20:21 PM
Metadata
Fields
Template:
Contracts
Company Name
ROCKFORCE CONSTRUCTION, LLC
Contract #
P 06-3510
Agency
Public Works
Council Approval Date
10/1/2019
Document Relationships
23A - PROJ - BRISTOL ST REHAB
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\10/01/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 06-3510 <br />SAN LORENZO SEWAGE LIFT STATION <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />Construct 12" Gravity Sewer and <br />1 <br />LS <br />$ <br />$ <br />Manholes from Sm. 30+00 to Sta. 31+90f <br />15 <br />Construct Connection to OCSD Existing <br />1 <br />LS <br />$ <br />$ <br />Manhole (Manhole No. 11) <br />lb <br />Abandon in Place Existing Sewer Mains <br />I <br />LS <br />$ <br />$ <br />17 <br />Furnish and Install Irrigation and <br />I <br />LS <br />$ <br />$ <br />Landscaping <br />18 <br />Prepare and Obtain Approval of Traffic <br />1 <br />LS <br />$ <br />$ <br />Control Plans <br />19 <br />Provide and Maintain Traffic Control <br />1 <br />LS <br />$ <br />$ <br />20 <br />Prepare and Implement Stormwater <br />1 <br />LS <br />$ <br />$ <br />Pollution Prevention Plan <br />21 <br />Removal of Existing Median/Landscaping, <br />1 <br />LS <br />$ <br />$ - <br />Construct Temporary Pavement including <br />Re -striping, and Replacement of Median <br />and Landsca in <br />22 <br />Removal and Replacement of Concrete <br />I <br />LS <br />$ <br />$ <br />Bus Pad <br />23 <br />Removal and Replacement of Curb, Gutter, <br />1 <br />LS <br />$ <br />$ <br />Sidewalk and Medians <br />24 <br />Replacement of Traffic Loops, Detectors <br />1 <br />LS <br />$ <br />$ <br />and Wiring <br />25 <br />Construct Grind and ARHM Overlay <br />44,000 <br />SF <br />$ <br />$ <br />26 <br />Furnish and Install Final Striping and <br />1 <br />LS <br />$ <br />$ <br />Replacement of Pavement Markings <br />27 <br />TV Inspection of Gravity Sewer Mains <br />I <br />LS <br />$ <br />$ <br />28 <br />Potholing <br />1 <br />LS <br />$ <br />$ _ <br />29** <br />Over -Excavation and Subgrade <br />100 <br />CY <br />$ <br />$ <br />Stabilization of Trenches <br />30 <br />Construction Staking <br />1 <br />LS <br />31 <br />Start-up, Testing and Training <br />I <br />LS <br />4000$ <br />32 <br />As -Built Plans, O&M Manuals and <br />1 <br />LS <br />Warranties <br />33 <br />Permits <br />l <br />LS <br />00 <br />P-2 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.