Award Contract to All Cities Engineering, Inc., for Riverview <br />Neighborhood Water Main Improvements Project <br />January 21, 2020 <br />Page 2 <br />DISCUSSION <br />Public Works Water Resources staff monitors the condition of water main pipelines by assessing <br />critical factors such as history of breaks, pipe size, alignment, location, and system redundancy to <br />determine replacement priorities. The existing 6-inch-diameter and 12-inch-diameter cast iron <br />water main located within the Riverview Neighborhood, which was installed in the 1950s, has been <br />experiencing a number of significant breaks and leaks, and has been identified for priority <br />replacement (Exhibit 1). <br />The proposed water system improvements for the Riverview Neighborhood will include new 8-inch <br />and 12-inch polyvinyl chloride (PVC) water main, fire hydrants, water services, appurtenances, <br />abandonment of the existing 6-inch-diameter and 12-inch-diameter cast iron water main, crack <br />sealing, asphalt concrete pavement, and traffic striping. Once this project is completed, water <br />service reliability and general service quality will improve significantly. The improvements will also <br />enhance ride quality, surface drainage, and appearance of the neighborhood. In addition, the <br />potential for disruption due to water main breaks will be substantially reduced. <br />In Fiscal Years 2015-16 and 2017-18, the City Council approved Capital Improvement Program <br />(CIP) budgets of $1,504,000 and $1,330,000, respectively, for the Riverview Neighborhood Water <br />Main Improvements Project, for a total budget of $2,834,000. To date, $153,753 has been spent <br />for the Design Engineering phase. The remaining appropriation of $2,680,247 was not carried <br />forward to the Fiscal Year 2019-20 budget and must be reappropriated before continuing with <br />project expenditures. Staff is requesting approval of an Appropriation Adjustment to reappropriate <br />the remaining project funding from the Water Fund prior year fund balance, plus an additional <br />$16,753 for Design Engineering and $461,896 for Construction costs. The total Appropriation <br />Adjustment request is $3,158,896, as outlined in the following table: <br />Approved FY 15/16 CIP Budget <br />$1,504,000 <br />Approved FY 17/18 CIP Budget <br />1,330,000 <br />TOTAL ORIGINAL PROJECT BUDGET <br />$2,834,000 <br />Less Expenditures to Date <br />- 153,753 <br />Total to be Reappropriated <br />$2,680,247 <br />Increase Design Engineering Budget <br />16,753 <br />Increase Construction Budget <br />461,896 <br />TOTAL APPROPRIATION ADJUSTMENT <br />(Total Reappropriation +Design & Constr. Increases) <br />REVISED TOTAL PROJECT BUDGET <br />(Total Original Project Budget + Design & Constr. Increases) <br />$3,158,896 <br />$3,312,649 <br />20B-2 <br />