Award Contract EBS General Engineering, Inc., for the Local Street Improvement <br />FY 19/20 and Flower Street Sewer Manhole Improvements Projects <br />January 21, 2020 <br />Page 3 <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BID* <br />1 <br />EBS General Engineering, Inc. <br />Corona <br />$2,546,154 <br />2 <br />R.J. Noble Company, Inc. <br />Orange <br />$2,584,378 <br />3 <br />All American Asphalt <br />Corona <br />$2,624,670 <br />4 <br />Vido Samarzich, Inc. <br />Rancho Cucamonga <br />$2,767,961 <br />5 <br />Excel Paving Co <br />Long Beach <br />$2,886,081 <br />6 <br />Hardy & Harper, Inc. <br />Lake Forest <br />$3,590,000 <br />* The Bid Documents specified the lowest bid would be determined by including the amount for Bid Alternate 1 <br />All 6 bids were responsive and EBS General Engineering Inc., submitted the lowest responsive bid <br />(Exhibit 3), in the amount of $2,546,154. Based on the bid analysis and a contractor's reference <br />check, staff recommends awarding the construction contract (Exhibit 4) to EBS General <br />Engineering Inc., in the amount bid. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total cost to <br />deliver the project also includes construction administration, inspection, and testing, along with an <br />allowance for contingencies to account for unexpected or unforeseen conditions. Construction <br />administration and inspection includes construction management; implementation of the City's <br />Community Workforce Agreement requirements; inspection of the Contractor's work to ensure <br />contract compliance, workmanship, and quality; and material testing. As indicated in the Cost <br />Analysis (Exhibit 5) and as summarized in the table below, the estimated total construction delivery <br />cost of the project is $3,226,287. <br />Construction Contract <br />1 $2,546,154 <br />Construction Administration, Inspection, and Testing <br />$381,922 <br />Contingencies <br />$298,211 <br />ESTIMATED CONSTRUCTION DELIVERY COST <br />$3,226,287 <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities & <br />Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City <br />assets), Strategy B (equitably maintain existing streets and associated assets in a state of good <br />repair so they are clean, safe and aesthetically pleasing for all users), Strategy C (invest resources <br />and technology to extend the service life of existing infrastructure to protect the City's investment <br />and support a high quality of life standard), and Strategy G (develop and implement the City's <br />Capital Improvement Program in coordination with the Community Investment Plan - e.g., <br />neighborhood streets, traffic improvements, etc.). <br />20C-3 <br />