My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - AGMT TETRA TECH INC
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
01/21/2020
>
25K - AGMT TETRA TECH INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 6:55:12 PM
Creation date
1/16/2020 6:20:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25K
Date
1/21/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRST STREET PEDESTRIAN IMPROVEMENTS PS&E <br />RFP NO.: 10-110 <br />southern limits of survey at all remaining intersections <br />along the limit of work will extend 100 feet past the <br />curb returns at each intersection. The topographic <br />survey will identify horizontally and vertically existing <br />facilities and features within the limit of work includ- <br />ing median islands, trees, curb & gutter, curb ramps, <br />curb returns, sidewalk, driveways, bus pads, grade <br />breaks, right-of-way, manholes, utility vaults <br />and boxes, utility cabinets and equipment, street <br />and traffic lights, utility poles, fire hydrants, drainage <br />structures, survey monuments, street furniture, <br />signage, fencing, and building faces constructed in <br />close proximity to the right-of-way. Storm drain catch <br />basin and manhole will be dipped to record invert <br />elevations where manhole lids are not bolted down. <br />The dipping of sewer manhole and other utility struc- <br />tures is not included in this scope of work. In addition <br />to the above items, centerline cross -sections will be <br />provided at 100-foot intervals. Contours will be dis- <br />played at half -foot intervals. It is assumed traffic con- <br />trol will not be required to perform the topographic <br />survey. <br />Electronic base maps will be prepared in US <br />Customary English Units by a California Licensed <br />Land Surveyor. The survey will comply with the City's <br />guidelines, and the final survey file deliverable will <br />be provided in MicroStation V8i Computer Aided <br />Design and Drafting (CADD) format. Survey control <br />will be tied horizontally to the North American <br />Datum of 1983 (NAD83) through GPS post processing <br />constrained to the California Spatial References <br />Center, Epoch 2017 Control. Vertical control will be <br />tied to the North American Vertical Datum of 1988 <br />(NAVD88) by occupation of the nearest City of Santa <br />Ana or NGS benchmark controlled by that datum. If <br />the benchmark used is not within site distance of the <br />project, a local survey benchmark will be established <br />for use during construction. <br />The Property Line surveys will be performed to <br />establish the limits of the public right-of-way in <br />the vicinity of the project. Sufficient boundary <br />monumentation will be recovered to orient a <br />survey boundary, compiled from record documents. <br />Additional available easements will also be plotted. A <br />full boundary establishment survey is not believed to <br />be necessary and is not included at this time. <br />TASK 3.0 PS&E (30%, 60%, 95%, AND <br />100% SUBMITTALS) <br />In order to meet the City's expectations, Tetra Tech <br />will develop and deliver detailed Plans, Specifications <br />and Estimates (PS&E) within four submittals. The 30% <br />PS&E submittal package will be utilized to establish <br />the conceptual design. The design will continue to be <br />developed during the 60% and 95% PS&E submittals. <br />The final 100% PS&E will be the final submittal <br />package developed at a high level of accuracy ready <br />for project advertisement. All submittal packages will <br />include a complete set of plans, specifications, and <br />cost estimate inclusive of the proposed improvements <br />from each discipline covered in this section. <br />Anticipated Sheet List <br /># of <br />Sheets <br />1 <br />Title Sheet <br />1 <br />Legend, Abbreviations, and Notes <br />2 <br />Typical Sections <br />13 <br />Roadway Plans and Profiles <br />13 <br />Enlarged Curb Return Plans <br />3 <br />Signing and Striping Plans <br />7 <br />Utility and WQMP Plans <br />1 <br />Roadway Details <br />1 <br />Signing and Striping Details <br />3 <br />Utility and WQMP Details <br />9 <br />Traffic Signal Plans <br />54 <br />TOTAL SHEETS <br />Civil Roadway Design <br />Tetra Tech will prepare the civil PS&E for the <br />project including the resurfacing or reconstruction <br />of the sidewalks, curb & gutter, driveways, bus <br />pads, curb ramps, roadway pavement, and street <br />furniture. Demolition callouts will be added to the <br />roadway plans to identify existing improvements <br />to be protected, relocated, or removed in order to <br />2 ryKy5{ { TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.